My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/26/1984
Ramsey
>
Public
>
Agendas
>
Council
>
1984
>
Agenda - Council - 06/26/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 11:17:21 AM
Creation date
7/14/2004 8:02:27 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/26/1984
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iZ7. <br /> <br />{dO an)' 1115T. OrlC, ar¢lnBeologlce! or <br />exist on or near the project site? <br /> <br />Will they likely be impacted by construction of the <br />project? Explain and indicate general location on <br />the site plan map. <br /> <br />x No <br /> <br />x 14o <br /> <br />...~Yes . <br /> <br />Yes <br /> <br />m <br /> <br />Will the¥6oJect cause the impairment or destruction of: <br />a. designated park or recreation areas? <br />b. prime or unique farmlands? <br />c. ecologically sensitive areas? <br />d, scenic views and vistas? <br />e. other unique resources (specify)? <br />Explain: <br /> <br />~.~o° Yes <br />_x'~o -'Yes <br /> "'Yes <br /> No '-'Yes <br />~----~o --Yes__ <br /> <br />I <br />m <br />I <br /> <br />29. <br /> <br />.3D. <br /> <br />What roads will receive increased traffic? (For each road indicate the total ADT <br />and increase in average daily traffic [ADT] contributed by the project.) <br />Road traffic on several area streets and thoroughfares will increase, during con- <br />struction. Development resulting from availability of service will result in <br />long term ADT increases. This will be addressed in specific project EAW's. <br />Are adequate energy sources and utilities nOw available to service the project? <br /> No x Yes If not, what additional utilities will be required? <br /> <br />SUMMARY OF ISSUES <br /> <br /> List the issues (if any) as identified by 'yes" answers above. Discuss alternatives <br /> and mitigative measures for these issues. <br />1. Dewatering during construction activities will probably require a DNR permit for water <br /> appropriation. Discharge of dewatering water wall not require treatment since it will <br /> not be contaminated. <br />2. Initial flows from the Ramsey 2nd interceptor are not expected to result in overload <br /> at the Anoka waste treatment facility. The interceptor at full capacity will substanial <br /> exceed the capacity of the treatment facility at Anoka. Subsequent sewer extensions wil <br /> be subject to environm6ntal review and permit review and approval. <br />3. Construction impacts are expected to be minimal and transitory. Mitigative measures axe <br /> available and will be incorporated into permit conditions. <br /> <br />CERTXFXCATION BY RESPONSIBLE GOVERNMENTAL UNIT <br /> <br />I hereby certify that the information contained in this document iis t~ue and correct <br />to the best of ~ry knowledge and that copies of the completed EAW have been made <br />available to all points on the official EQB distribution list. <br /> <br />Title Director, Office of Planning & Rev <br /> <br />Date <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.