My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/27/1984
Ramsey
>
Public
>
Agendas
>
Council
>
1984
>
Agenda - Council - 03/27/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 11:14:08 AM
Creation date
7/14/2004 10:28:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/27/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID TABULATION BASE PROPOSAL I <br />CENTRAL PARK IMPROVEMENT PROJECT 83-17 <br />CONSTRUCTION OF IRRIGATION WELL AND INSTALLATION OF <br /> MECHANICAL & ELECTRICAL EQUIPMENT <br /> CITY OF RAMSEY, MINNESOTA <br /> <br />March 20, 1984 <br /> <br />Bidder: <br /> <br />North Star Drilling, Inc. <br /> <br />BID SCHEDULE 1.O00 - IRRIGATION WELL <br /> <br />Item <br /> <br />Estimated Quantity <br /> <br />Unit Price <br /> <br />1. Mobilization and <br /> Demobi 1 ization <br />2. Drill Nominal 13~" Open Hole <br />3. Furnish & Place 8" Casing <br />4. Neat Cement Grout-g4# Bag <br />5. Drill 8" Open Hole <br />6. Developing Well <br />7. F&I Air Development Equipment <br />8. Air Development <br /> <br /> 9. Installing & Removing <br /> Test Pump <br />10. Test Pumping <br />ll. Electric Log & Report <br /> <br />1 Lump Sum $ 700.O0/LS <br />325 Linear Feet $ IO.O0/LF <br />325 Linear Feet $ 12.00/LF <br />160 Each $ 12.00/EA <br />45 Linear Feet $ 20.O0/LF <br />50 Cubic Yard $ 70.O0/CY <br />1 Each $ 200.O0/EA <br />30 Hours $ 85.00/HR <br /> <br />1 Each $ 550.O0/EA <br />20 Hours $ 55.00/HR <br />1 Lump Sum $ 600.O0/LS <br /> <br />Total Bid Schedule 1.000 - Construction of Irrigation Well - <br /> <br />BID SCHEDULE 2.000 - MECHANICAL & ELECTRICAL EQUIPMENT <br /> <br />Item <br /> <br />Estimated Quantity <br /> <br />Unit Price <br /> <br />1. Submersible Pump <br />2. Column Pipe <br />3. Miscellaneous Piping <br />4. Check Valve <br />5. Gate Valves <br />6. Air Release Valve <br />7. Pressure Relief <br />8. Electrical Controls <br /> <br />1 Lump Sum $ 5,200.00/LS <br />100 Linear Feet $ 6.00/LF <br />1 Lump Sum $ 1,450.O0/LS <br />1 Lump Sum $ 240.00/LS <br /> 2 Each $ 220.O0/EA <br /> 1 Lump Sum $ 75.00/LS <br /> 1 Lump Sum $ 75.00/LS <br /> 1 Lump Sum $ 2,950.00/LS <br /> <br />Total Bid SchedUle 2.000 - Mechanical & Electrical Equipment - <br /> <br />SUMMARY OF BASE PROPOSAL I <br /> <br />Bid Schedule 1.O00 - <br />Bid Schedule 2.000 - <br /> <br />$19,170.00 <br />$11,030.00 <br /> <br />Total Base Proposal I - $30,200.00 <br /> <br />Extension <br /> <br />$ 700.00 <br />$ 3,250.00 <br />$ 3,gO0.O0 <br />$ 1,920.00 <br />$ 900.00 <br />$ 3,500.00 <br />$ 200.O0 <br />$ 2,550.00 <br /> <br />$ 550.00 <br />$ 1,100.00 <br />$ 600.O0 <br /> <br />$ 19,170.00 <br /> <br />Exten si on <br /> <br />$ 5,200.00 <br />$ 600.00 <br />$ 1,450.00 <br />$ 240.00 <br />$ 440.00 <br />$ 75.00 <br />$ 75.00 <br />$ 2,950.00 <br /> <br />$ ll,030.O0 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.