Laserfiche WebLink
m <br /> I <br /> i <br /> i <br /> <br /> I <br /> i <br />'1 <br /> I <br />I <br /> i <br /> I <br /> i <br /> i <br /> i <br /> i <br /> i <br /> I <br /> I <br /> <br /> Summary <br />Work Plan Addendum <br />Submitted November 27, 1985 <br /> <br />1. Construction of 16 additional groundwater monitoirng wells. <br /> bring the total to 53 groundwater monitoring wells.) <br /> <br />2. Construction of two piezometers. <br /> <br />3. Downhole Geophysical Logging at each location. <br /> <br />4. Soil sampling during drilling. <br /> <br />5. Laboratory analysis of selected soil samples. <br /> <br />6. On-site testing of hydrogeological characteristics. <br /> <br />7. Water sample analysis at domestic wells. <br /> <br />8. Water sample analysis at monitoring wells. <br /> <br />9. Water level measurements. <br /> <br />10. <br /> <br />Final Report. <br /> <br />(This will <br /> <br /> <br />