Laserfiche WebLink
Primary Project Elements <br /> Boom <br /> Residential <br /> ResideMisl <br /> / f LJT L LT 11 <br /> Fountain and open space Shared street in commercial district <br /> 'dentis _ Wn <br /> Open <br /> I.eld <br /> center <br /> cityHull <br /> Welcoming edges,gateway to park Forest walk to Lake Ramsey Illustrative Plan (Cunningham Group 2013) <br /> Municipal Plaza <br /> Basic assumptions that support Estimate of Potential Construction Costs: <br /> • Total acres/square footage(approximate): 2 acres/87,120 square feet <br /> Estimate based on park elements illustrated on Concept Studies: <br /> 1. pavement(1/2 of total park area)43,560 x$15/square foot $650,000 <br /> 2. plantings(1/2 of total park area)43,560 x$12/square foot $525,000 <br /> 3. stage area canopy(space frame/awning) $250,000 <br /> 4. lighting 70 pedestrian scale fixtures x$5,000 each $350,000 <br /> 5. furniture i.e.planter walls,benches,bike racks,receptacles,etc $300,000 <br /> 6. signage including large monument,information,direction $ 100,000 <br /> 7. water feature(decorative,interactive,sculptural) $200,000 <br /> 8. excavation/grading 25,000 cubic yards x$3/cubic yard $75,000 <br /> 9. stormwater(surface/below ground),utilities,infrastructure* $250,000 <br /> Subtotal $2,700,000 <br /> Contingency and Soft Costs $810,000 <br /> TOTAL $3,510,000 <br /> or$40.29 per square foot <br /> *District systems approach vs.site by site. <br /> Public Realm Framework+Cost Evaluation <br />