Laserfiche WebLink
The original Contract Sum was $ 1,685,000 <br /> Net change by previously authorized Change Orders $ 30,091 <br /> The Contract Sum prior to this Change Order was $ 1,715,091 <br /> The Contract Sum will be (increased)(deeFeased)(biReh@Rged) by this change order in the $ 5 <br /> amount of <br /> The new Contract Sum including this Change Order will be $ 1,715,096 <br /> The Contract time will be (;,;c-ppasPd)(i4pc-ppaspi4)(unchanged) by(0) days. <br /> The date of Substantial Completion as of the date of this Change Order therefore is: March 15, 2016 <br /> NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price <br /> which have been authorized by Construction Change Directive until the cost and time have been agreed upon by <br /> both the Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change <br /> Directive. <br /> NOT VALID UNTIL SIGNED BY THE ARCHITECT, CONTRACTOR AND OWNER: <br /> ARCHITECT CONTRACTOR OWNER <br /> Boarman Kroos Vogel Group, Inc. Brennan Construction of MN City of Ramsey <br /> Address Address Address <br /> 222 N. 2nd Street 5985 Brandel Rd NW 7550 Sunwood Drive <br /> Minneapolis, MN 55401 Mankato, MN 56001 Ramsey, MN 55303 <br /> BY BY BY <br /> Bruce Schwartzman Joe Brennan Matt Kohner <br /> DATE DATE DATE <br /> AIA DOCUMENT G701 * CHANGE ORDER* 2001 EDITION *AIA-COPYRIGHT 2001 <br /> THE AMERICAN INSTITUTE OF ARCHITECT'S, 1735 NEW YORK AVE., N.W.,WASHINGTON, D.C. 20006-5292 <br /> WARNING; Unlicensed photocopying violates U.S. copyright law and is subject to legal prosecution. This document was <br /> electronically produced with permission of the AIA and cannot be reproduced without violation until the date of <br /> expiration noted below. <br /> BKV Group, Inc . <br />