Laserfiche WebLink
7. Do not use Shop Drawings without an appropriate stamp indicating action taken. <br /> 3.05 PRODUCT DATA <br /> A. Collect Product Data into a single submittal for each element of construction or system. Product Data includes <br /> printed information,such as manufacturer's installation instructions,catalog cuts,standard color charts,standard <br /> wiring diagrams,applicable certifications and performance curves. Mark each copy to show applicable choices <br /> and options. Where printed Product Data includes information on several products that are not required,mark <br /> copies to indicate the applicable information. <br /> 3.06 SAMPLES <br /> A. Submit full-size, fully fabricated Samples cured and finished when specified and physically identical with the <br /> material or product proposed. Samples include partial sections of manufactured or fabricated components, cuts <br /> or containers of materials,color range sets,and swatches showing color,texture,and pattern. Mount or display <br /> Samples in the manner to facilitate review of qualities indicated. <br /> 3.07 CRUSHING PLAN <br /> A. Submit a crushing plan indicating proposed location of crusher, proposed equipment, proposed duration of <br /> crushing operation,proposed hours for crushing. Indicate temporary stockpile locations and proposed duration. <br /> B. Submit proposed plan for dust control,including restrictions during high winds. <br /> C. Provide pictures of crusher and any other equipment proposed for the operation and videos of crusher in <br /> operation. <br /> D. Provide information regarding proposed ultimate(off-site)location of crushed materials/end user. <br /> 3.08 QUALITY ASSURANCE AND QUALITY CONTROL SUBMITTALS <br /> A. Submit quality assurance and quality control submittals, including design data, certifications, manufacturer's <br /> instructions, manufacturer's field reports, materials test results, field testing and inspection reports, and other <br /> quality-control submittals as required under other Sections of the Specifications. <br /> B. Certifications: Where other Sections of the Specifications require certification that a product, material, or <br /> installation complies with specified requirements, submit a certification from the manufacturer or responsible <br /> engineer certifying compliance with specified requirements. <br /> C. Calculations: When required in the technical specification, calculations shall be prepared and signed by a <br /> Professional Engineer registered in the State of Minnesota. <br /> 3.09 ENGINEER/ARCHITECT'S ACTION <br /> A. Except for submittals for the record, or for information where action and return is not required, Engineer will <br /> review each submittal, mark to indicate action taken, and return within the time frame specified in Paragraph <br /> 3.1.A.3. <br /> 1. Compliance with specified characteristics is the Contractor's responsibility. <br /> B. Action Stamp: Engineer will stamp each submittal with a uniform,action stamp. Engineer will mark the stamp <br /> appropriately to indicate the action taken,as follows: <br /> 1. "Reviewed":the Work covered by the submittal may proceed provided it complies with requirements of the <br /> Contract Documents. Final payment depends on that compliance. <br /> Division 1—General Requirements <br /> DVI-3 <br />