Laserfiche WebLink
Primary Project Elements <br /> t <br /> r <br /> 1 <br /> .loll <br /> Bike trail and path Wading Pond and splash p.- <br /> Planted,soft edges Flex use pavilion Pedestrian paths <br /> Lake Ramsey Commons <br /> Basic assumptions that support Estimate of Potential Construction Costs: <br /> • Total acres/square footage for park area(approx.): 13.5 acres/588,060 square feet <br /> • Total acres/square footage for lake(surface area approx.):6 acres/261,360 square feet <br /> Estimate based on park elements illustrated on Concept Studies: <br /> 1. concrete wading pond,overlook;$6/sf $130,800 <br /> 2. concrete bike trail and pedestrian path;$5/sf $270,000 <br /> 3. plantings-200,000 square feet x$5/square foot $ 1,000,000 <br /> 4. lighting 70 pedestrian scale fixtures x$5,000 each $350,000 <br /> 5. furniture,signage and lighting $750,000 <br /> 6. splash pad play water feature(interactive,sculptural) $300,000 <br /> 7. entry plaza including pavement,sculpture $ 100,000 <br /> 8. fishing pier $30,000 <br /> 9. pavilion (flex use,picnic shelter,no rest rooms) $250,000 <br /> 10. excavation/grading 183,000 cubic yards x$3/cubic yard $540,000 <br /> 11. lake liner 300,000 square feet x$3.50/square foot $ 1,050,000 <br /> 12. stormwater(surface/below ground),utilities,infrastructure* $300,000 <br /> Subtotal $4,710,800 <br /> Contingency and Soft Costs $ 1,413,240 <br /> TOTAL $6,224,040 <br /> *District systems approach vs.site by site. or $ 10.58 per square foot <br /> Public Realm Framework+Cost Evaluation <br />