Laserfiche WebLink
Right of Way and Easements <br /> Locations of right of way needs are depicted on the exhibits based on roadway and trail needs. The <br /> exact areas will need to be determined during the platting process. We assumed that the rights of way <br /> would be dedicated as a portion of the development process and no costs are included in the project <br /> costs for acquisitions. <br /> Timing of Improvements <br /> While the improvements discussed and depicted in the exhibits will be required to support the area, <br /> timing of the improvements will most likely be dependent upon each proposed development. For <br /> instance, the portions of Lot 7 (See Figure 17)that are within Phase 1 could potentially be developed <br /> without further public improvements being required immediately. Roadways and intersections are <br /> adequate to support development of this parcel and trunk sanitary sewer and trunk water have been <br /> extended through this area. In cases such as this, the properties would most likely be assessed at such <br /> time as the City determines the public improvements are necessary. <br /> As individual developments are considered, the public infrastructure will need to be reviewed and <br /> determinations made as to its adequacy. As upgrades, extensions and improvements are determined to <br /> be necessary,funding strategies will need to be developed which may include full of partial assessments <br /> to benefitting properties. <br /> COST CONSIDERATIONS <br /> Costs were developed based upon phased implementation. The phasing is as depicted on Figure 4 in <br /> Appendix A. All costs presented in the following pages are 2015 costs, with no allowance for inflation. <br /> Improvement Type Phase 1 Phase 2 Phase 3 <br /> Roadway $ 1,427,000 $ 1,383,000 $ 1,626,000 <br /> Trails/Sidewalks $ 220,000 $ 146,000 $ 175,000 <br /> Storm Water Management $ 0 $ 0 $ 64,000 <br /> Street Lighting $ 143,000 $ 104,000 $ 126,000 <br /> Trunk Water $ 19,000 $ 219,000 $ 247,000 <br /> Trunk Sanitary Sewer $ 11,000 $ 188,000 $ 654,000 <br /> Total Costs/Phase $ 1,820,000 $ 2,040,000 $ 2,892,000 <br /> The above costs are considered project costs and include 30% contingencies and project development <br /> costs. Project development costs include administrative, engineering, and fiscal related costs. <br /> The roadway costs include allotments for phase transitions associated with tapering pavements sections <br /> to match in-place sections where required, and subsequent removals of the transition areas. Right turn <br /> lanes are not depicted on the graphics, but will be required. The actual right turn lane locations and <br /> Prepared by: Bolton & Menk, Inc. COST CONSIDERATIONS <br /> City of Ramsey— Future Business Park Page 11 <br />