My WebLink
|
Help
|
About
|
Sign Out
Home
11/05/86
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1986
>
11/05/86
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 4:16:08 PM
Creation date
7/21/2004 10:08:46 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
11/05/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE V <br /> <br />TYPICAL ANNUAL COSTS <br /> <br />A. Trunk Costs per Acre: <br /> <br />Cost per acre commercial <br />Annual cost per acre commercial <br /> <br />B. Lateral Benefit Sanitary Sewer: <br /> <br />Sanitary <br /> Sewer <br /> <br />$2,190.60 <br /> $341.30 <br /> <br /> Water Total <br /> <br />$4,872.28 $7,062.88 <br />$ 759.10 $1,100.40 <br /> <br />Cost per front foot $100,464.30 ~ 3348.81 ft. = <br />Lateral cost per typical 200 foot lot = <br />Annual cost per typical 200 foot lot = <br /> <br />$ 30.00 <br />$6,000.00 <br />$ 934.80 <br /> <br />Table VI shows a summary of the proposed assessments for the <br />properties to be assessed. <br /> <br />IX. <br /> <br />PROJECTED PROJECT SCHEDULE <br /> <br />If the city should elect to proceed with the improvements, the <br />following schedules could be anticipated: <br /> <br />ae <br /> <br />SCHEDULE FOR SANITARY SEWER AND WATER IMPROVEMENTS: <br /> <br />Accept feasibility study and hold <br />public hearing <br /> <br />Order plans and specifications <br /> <br />Set date to receive bids for <br />construction <br /> <br />Receive bids <br /> <br />Set date to receive bids for bonds <br />and award construction contract <br /> <br />Receive bids on bonds <br /> <br />Begin Construction <br /> <br />Complete Construction <br /> <br />Hold assessment hearing <br /> <br />October 20, 1986 <br /> <br />December 23, 1986 <br /> <br />December 23, 1986 <br />January 26, 1987 <br /> <br />January 27, 1987 <br /> <br />February 17, 1987 <br /> <br />March 16, 1987 <br /> <br />August 15, 1987 <br /> <br />September, 1987 <br /> <br />14 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.