Laserfiche WebLink
TABLE V <br /> <br />TYPICAL ANNUAL COSTS <br /> <br />A. Trunk Costs per Acre: <br /> <br />Cost per acre commercial <br />Annual cost per acre commercial <br /> <br />B. Lateral Benefit Sanitary Sewer: <br /> <br />Sanitary <br /> Sewer <br /> <br />$2,190.60 <br /> $341.30 <br /> <br /> Water Total <br /> <br />$4,872.28 $7,062.88 <br />$ 759.10 $1,100.40 <br /> <br />Cost per front foot $100,464.30 ~ 3348.81 ft. = <br />Lateral cost per typical 200 foot lot = <br />Annual cost per typical 200 foot lot = <br /> <br />$ 30.00 <br />$6,000.00 <br />$ 934.80 <br /> <br />Table VI shows a summary of the proposed assessments for the <br />properties to be assessed. <br /> <br />IX. <br /> <br />PROJECTED PROJECT SCHEDULE <br /> <br />If the city should elect to proceed with the improvements, the <br />following schedules could be anticipated: <br /> <br />ae <br /> <br />SCHEDULE FOR SANITARY SEWER AND WATER IMPROVEMENTS: <br /> <br />Accept feasibility study and hold <br />public hearing <br /> <br />Order plans and specifications <br /> <br />Set date to receive bids for <br />construction <br /> <br />Receive bids <br /> <br />Set date to receive bids for bonds <br />and award construction contract <br /> <br />Receive bids on bonds <br /> <br />Begin Construction <br /> <br />Complete Construction <br /> <br />Hold assessment hearing <br /> <br />October 20, 1986 <br /> <br />December 23, 1986 <br /> <br />December 23, 1986 <br />January 26, 1987 <br /> <br />January 27, 1987 <br /> <br />February 17, 1987 <br /> <br />March 16, 1987 <br /> <br />August 15, 1987 <br /> <br />September, 1987 <br /> <br />14 <br /> <br /> <br />