My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/27/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 07/27/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:29:19 PM
Creation date
7/23/2004 1:43:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/27/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PAY ESTIMATE NO. 2 <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br /> <br />Bid Schedule "C" - S.A.I'. 199-109-(H - Rhinestone Street NW Continued <br /> <br />ITEM CONTRACT USED T0- <br /> ITEM QTY UNIT UNIT COST EXTENSION <br />NO. AMOUNT DATE <br />213 CONSTRUCT DRAINAGE STRUCTDIGE DESIGN 48 - 4020 49 LF $144.55 $7,082.95 19.9 $2,876.55 <br />214 CONSTRUCT DRAINAGE STRUCTURE DESIGN 54 - 4020 11 LF $202.58 $2,228.38 9.] $1,843.48 <br />215 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 - 4020 10 LF $240.94 $2,409.40 $0.00 <br />216 CONSTRUCT DRAINAGE STRUCTURE DESIGN 66 - 4020 8 LF $284.46 $2,275.68 5.2 $1,479.19 <br />217 CONSTRUCT DRAINAGE STRUCTUI:GE DESIGN 72 - 4020 12 LF $355.03 $4,260.36 9.8 $3,479.29 <br />218 CONSTP,.UCT DP, AINAGE STP, UCTURE DES1GN 78 - 4020 19 LF $354.94 $6,743.86 6.3 $2,236.'12 <br />2] 9 CONSTRUCT DRAINAGE STRUCTUKE DESIGN 84 - 4020 7 LF $456.75 $3,197.25 17.3 $7,901.78 <br />220 CONSTRUCT DR.AINAGE STRUCTUKE DESIGN 96 - 4020 40 LF $544.76 $21,790.40 2 $1,0gg.fi2 <br />221 CASTING ASSEMBLIES SPECIAL 30 EACH $479.25 $14,377.50 $0.00 <br />222 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL I 6 EACH $3'/6.58 $2,259.48 $0.00 <br />223 4" CONCRETE WALK 23000 SF $2.01 $46,230.00 $0.00 <br />224 6" CONCRETE WALK 2500 SF $4.33 $10,825.0~ $0.00 <br />225 CONCRETE CURB AND GUTTER DES1GN B618 2430 LF $7.59 $18,443.7~ $0.00 <br />226 PEDESTRIAN CURB RAMP 24 EACH $319.92 $7,678.08 $0.00 <br />227 SIGN PANELS TYPEC ]88.5 SF $22.19 $4,182.82 $0.00 <br />228 PAVEMENT MESSAGE (ONLY) EPOXY 4 EACH $200.00 $800.00 $0.00 <br />229 PAVEMENT MESSAGE (ILIG}IT AILROW) EPOXY 3 EACH $144.48 $433.44 $0.00 <br />230 PAVEMEN'I MESSAGE (LEFT ARROW) EPOXY 5 EACH $144.48 $722.40 $0.00 <br />231 F & I SIGN PANELS TYI'E "D" 3 EACH $258.00 . $774.00 $0.00 <br />232 4" SOLID LINE WItITE - PAINT 1850 LF $0.41 $758.50 $0.00 <br />233 24" SOLID LINE WItITE - PAINT 20 LF $3.87 $77.40 $0.00 <br />234 36" SOLID LINE WHITE - PAINT 50 LF $5.68 $284.00 $0.00 <br />235 4" BF, OKEN LINE YELLOW- PAINT 150 LF $0.42 $63.00 $0.00 <br />236 4" DOUBLE SOLID LINE YELLOW - PAINT 1150 LF $0.85 $977.50 $0.00 <br />237 24" SOLID LINE YE1,LOW - PAINT 180 LF $2.58 $464.4G $0.0g <br />238 4" SOLID LINE WI-lITE - EPOXY 4]00 LF $0.50 $2,050.0C $0.00 <br />239 24" STOP I,INE WHITF, - EPOXY 300 LF $7.22 $2,166.0C $0.00 <br />240 36" SOLID LINE WHrI'E- EPOXY 570 LF $8.67 $4.941.9¢ $0.00 <br />241 14" BROKEN LINE YELLOW- EPOXY 1800 LF $0.51 $918.0C $0.00 <br />242 4" DOUBLE SOLID LINE YELLOW - EPOXY 600 LF $1.01 $606.0¢ $0.00 <br />243 24" SOl,ID LINE YELl,OW - EPOXY 50 LF $5.68 $284.ocI $o.oo <br />244 INSTAL[, 4"-6" PVC (SC}I 40) CONDUIT 1000 LF $6.45 $6,450.0C $0.00 <br /> <br />G:lSl~aredDocslMumc~pallARamsey/ <br />3171/ra3171pe.xlsPAY ESTIMATE r40 2 <br /> <br />PE-8 Rev. 4/14/04 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.