Laserfiche WebLink
NORTH METRO TRAFFIC TASK FORCE <br />PROPOSED WORK PROGRAM AND SCttEDULE <br /> <br />MAJOR WORK PROGRAM TASKS <br /> <br />PROPOSED COMPLETION DATE <br /> <br />1. LAND USE AND DEVELOPMENT DATA AND ANALYSIS <br /> <br />Prepare 1984 composite land use map of study <br />area; and update TAZ zonal data for total households, <br />total population,' total employment, and retail/ <br />service employment (where differences are 20 percent <br />or more). <br /> <br />February, 20 <br /> <br />Prepare year 2000 composite land use map of <br />study area based on local land use plans and <br />projections; and update TAZ forecasts for above <br />categories (where differences are 20 percent or <br />more).' ' <br /> <br />March 27 <br /> <br />2. FUNCTIONAL ROAD CLASSIFICATION PLAN <br /> <br />Prepare 1984 functional road classification plan <br />for existing road network that is consistent across <br />'the study area. ;" <br /> <br />February 13 <br /> <br />Prepare year 2000 functional road classification <br />plan showing expected changes and additions to 1984 <br />network and is consistent across the study area. <br /> <br />Examine the Council's year 2000 computer model road <br />network to determine if changes are needed to make <br />it comparable to the year 2000 study area netwgrk. <br /> <br />CANDIDATE BRIDGE LOCATION ANALYSIS <br /> <br />February 27 <br />April 1 <br /> <br />May 8 <br /> <br />Examine the river from i01 to 694 in half-mile segments, <br />and determine possibility of having a bridge location <br />within each segment. <br /> <br />STUDY THE DIRECTION OF TRAVEL WITHIN/THROUGH THE STUDY AREA <br /> <br />Prepare a "desire-line" or "selected-link" network analysisJune 5 <br />using computer generated origin/destination figures on a <br />district, zone or subzone basis, <br /> <br />Conduct a limited "real time" origin/destination study using May 15 <br />a license plate survey technique, and use as a check on the <br />computer generated O/D study. <br /> <br />NEEDS EVALUATION <br /> <br />A. Define alternative crossings and land use configurations <br /> to be tested. <br /> <br />May 22 <br /> <br />Bt <br /> <br />Council/MnDOT computer program generates.traffic analysis July i5 <br />of the alternatives. <br /> <br />6. SUMMARY REPORT -- A STUDY OF BRIDGE NEEDS IN THE STUDY AREA <br /> <br />August 15 <br /> <br />Tlle..,,_.,,:.,.,,~,t,.echnlc~l cqmmi.t,tee will produce a draft summary report <br />on~'~'~t~'~i~'h~'~'~udy area based on local development <br />plans.'" . <br /> <br /> <br />