My WebLink
|
Help
|
About
|
Sign Out
Home
02/05/85
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1985
>
02/05/85
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 3:53:56 PM
Creation date
7/30/2004 8:31:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
02/05/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4) Vegetative screening sha~l be utilized to <br /> the ~axi~u~ eztent consistent with sa[ety <br /> <br /> line~ o~ high ridge~, the alteration of the <br /> natural environment, tncluOtng graOing, <br /> <br /> 6) The crossings shall be subject to the <br /> site planning requirements set forth <br /> At.cie ~. <br /> <br />c) Utility Substanttons. Utility <br />shall be subject to the following standa~d~. <br /> <br /> 1) ~11 ~ubstations shall be suh~ect to th~ <br /> mite planning ~equi~ements set forth <br /> <br /> 2) Re~ substitutions or refurbishment <br /> existing ~ub~tation~ shall be co~patibl~ <br /> height, scale, building ~aterials, land~seap- <br /> lng and signing wi~ the suriounding <br /> environment or land uses. Screening <br /> nmtural ~eans is encouraged and should <br /> co~tible with ~e ~urrounding environment <br /> <br />I d) Pil~line~. Pipelines and underground uttlit' <br /> facilities shall be subject to the following stand' <br /> <br />&r~: <br /> <br />1) All pipelines and underground facilitie <br />shall be subject to the site planning requir~ <br />ment~ set for. th in Article __, <br />2) "~he facilities shall be located to avo] <br />wetlands, woodlands and areas of unstab] <br /> <br />3) ~11 unBezgzounfl placmng' of utility facil: <br />tie~ an6 pi~line~ aha11 be followed by mere, <br />etation an~ ~ehabilitation to the conflitio: <br /> <br /> which existed on site prior to develop~en <br /> <br />2) Public and Private l~oads and l~ailvays, l~ew roa <br />and railways crossing the Critical Area Corridor <br />routed within the Critical Area Corridor shall meet t <br />following stan~r~s: <br /> <br /> a) ~aBs anB railways shall be constructed to B{ <br /> <br />~:je 2'/of 31 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.