My WebLink
|
Help
|
About
|
Sign Out
Home
02/19/85
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1985
>
02/19/85
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 3:54:08 PM
Creation date
7/30/2004 8:47:05 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
02/19/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! <br /> <br />i <br />I <br />I <br />I <br />I <br />i <br />I <br />I <br />I <br />I <br />I <br /> <br />ACTVTY', Industrial Uses <br /> <br /> m <br />DEFINIT©N~ <br /> <br />All industrial and manufacturing uses, and other uses which are of the <br />same general character. <br /> <br />CIRITEI~IA~ <br /> <br />Each of the following applicable criteria must be <br />answered "yes" and implemented within the development <br />plan. <br /> Yes No NA' <br /> <br />1. Does the project gain its primary vehicular access <br /> from a street other than South College Avenue? <br /> <br />5 <br /> <br />Have all necessary precautions been taken to <br />prevent all lubricants and fuel oil substances, <br />which are stored on the site, from leaking or <br />draining into the groundwater system, streams, <br />creeks, or other water bodies? <br /> <br />Are all repair, painting and body work activities, <br />including the storage of refuse and vehicle parts, <br />planned to take place within an enclosed structure? <br /> <br />i 1i' ll'q <br /> <br />DOES THE PROJECT EARN AT LEAST 50% OF THE MAXIMUM <br />POINTS AS CALCULATED ON "POINT CHART F" FOR THE <br />FOLLOWING CRITERIA: <br /> <br />a. Is the project located within "north" Fort Collins? <br /> <br />Is the project contiguous to or functionally a part of an <br />existing or planned office or industrial park, or in the case <br />of a single user, employ a total of more than 100 full-time <br />employees during a single 8-hour shift? <br /> <br />-25- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.