Laserfiche WebLink
--corqinued,, <br /> <br />16. <br /> <br />If the project includes an area known to contain a commercial <br />mineral deposit for which extraction is or will be commercially <br />feasible, has the project been designed not to preclude extrac- <br />tion? <br /> <br />17. Ecologically sensitive areas (reserved). <br /> <br />18. Lands of agricultural importance (reserved). <br /> <br />Environmentol <br /> <br />Stondords <br /> <br />19. <br /> <br />Will the project conform to applicable local, state and federal <br />air quality standards including but not limited to odor; dust; <br />fumes or gases which are noxious, toxic or corrosive; sus- <br />pended solid or liquid particles; or any air contaminant which <br />may obscure an observer's vision? <br /> <br />20. <br /> <br />Will the project conform to applicable local, state and federal <br />water quality standards, including but not limited to erosion and <br />sedimentation; runoff control; and solid wastes and hazar- <br />dous substances? <br /> <br />21. <br /> <br />Can the proposed land uses and activities be conducted so that <br />noise generated shall not exceed the minimum performance levels <br />as specified in the City's noise control ordinance? The maximum <br />noise dB level allowed will be based upon the land use being <br />proposed rather than the zoning district category for which it is <br />a part. Detailed plans for the elimination of objectionable <br />noises may be required before the issuance of a building permit. <br /> <br />22. <br /> <br />If the proposed activity produces intense glare or heat, whether <br />direct or reflected, is the operation conducted within an en- <br />closed building or with other effective screening in such a <br />manner as to make such glare or heat completely imperceptible <br />from any point along the property line? Detailed plans for the <br />elimination of intense glare or heat may be required before <br />issuance of a building permit. <br /> <br />23. <br /> <br />Will the project cause no inherent or recurring generated vibra- <br />tion perceptible without instruments at any point along the <br />property line? Temporary construction is excluded from this <br />cfi teri on. <br /> <br />24. Is the exterior lighting, except for overhead street lighting and <br /> warning emergency or traffic signals, installed in such a manner <br /> <br />-8- <br /> <br /> <br />