My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 08/05/2004
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2004
>
Agenda - Planning Commission - 08/05/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:34:00 AM
Creation date
8/2/2004 8:18:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
08/05/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
141st Avenue in the newly created Basalt Office Park 2nd Addition. She stated Basalt Properties, <br />LLP is proposing to construct a 40,650 square foot office and warehouse building on Lot 2 of <br />Basalt Office Park 2nd Addition. She indicated the site plan is meeting or exceeding the required <br />setbacks. She explained the development is on a 3.32 acre parcel, and lot coverage has been <br />calculated at 28%, which is under the 45% maximum lot coverage restriction established in City <br />Code. <br /> <br />Associate Planner Wald stated the site will derive one access point from 141st Avenue. She <br />indicated there is a statement in the report that Staff was unsure of the parking spaces being <br />provided, however she has had a conversation with the architect and was informed they would be <br />providing 57 spaces, when 55 are required. ~* <br /> <br />Associate Planner Wald advised the grading and drainage plan is generally acceptable with the <br />revisions outlined in the City Staff Review Letter~ She stated Staff recommends site plan. <br />approval contingent upon compliance with City Staff Review Letter dated June 11, 2004, and the <br />developer entering into a TIF agreement with the City. <br /> <br />Commission Input <br /> <br />Vice Chair Jolmson noted the applicant is not here, and stated he assumes they are comfortable <br />with the Staff Review LetXer. <br /> <br />Associate Planner Wald. indicated she had a conversation with the developer and believes they <br />are comfortable. <br /> <br />Commissioner Van Scoy stated he is interested in access to the lot. He indicated in the Staff <br />Review Letter it stated one access point, but from the site plan he does not see one access. <br /> <br />Associate Planner Wald advised they are calling it one access; it is really just ingress/egress. She <br />showed the plan and the access layout. <br /> <br />Commissioner Van Scoy stated he assumes it will be one-way. He is concerned about traffic <br />with large trucks going in. <br /> <br />Commissioner Jeffrey agreed, indicating he can see some concern with having trucks entering <br />and exiting close to the corner. <br /> <br />Associate Planner Wald stated the engineer looked at it and did not state any concerns. She <br />indicated the site plan is somewhat deceiving because there is green space between the drive lane <br />and the curb. She stated Staff is very comfortable with the layout. <br /> <br />Commissioner Van Scoy stated he would like the engineer's to review the proposed access <br />layouts in detail prior to City Council review. He indicated if the trucks are cutting across cross- <br />traffic he has a problem with it. <br /> <br />72 <br /> <br />Planning Commission/June 16, 2004 <br /> Page 2 of 15 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.