Laserfiche WebLink
I <br /> I <br />'1 <br /> I <br /> I <br /> I <br /> I <br /> <br />Ye <br /> <br />The licensee shall conduct Phase Il monitoring on Wells IA, ~&, 7, and B. Tt~5 <br />monitoring to include 811 U.5. E.P.k. ~riority ~llutant~ in the 3uly ~mplin~ event. <br />the other three ~mp]in~ e~ent~ durin~ th~ li¢~n~ ~ar analysis lot m~tal5 and ~olatil~ <br />organics a~ ~ells IA, 2A~ 7, and ~ shall ~ done. <br /> <br />An additional web shall be installed down gradient from Wails IR and $ (approximatel) <br />700 feet northeast o! Well 2A, along the 860 I:round water elevation} by September <br />lggO) and ~mpled as ~t lorth ~bove. <br /> <br />Water level measurements shall be taken and recorded, at the time o! each sampling <br />event, from ali monitoring wells and piezometers. <br /> <br />The licensee shall terminate the east end o! the fill subject to the following schedule: <br /> <br />Provide soils analysis and identification el <br />specifications, by November 30, 19gq. <br />Apply final earthen cover by 3un, 1, 1985. <br />Complete the seeding by 3un. 15, 1985. <br /> <br />the soils to be <br /> <br />used, or blendin[, <br /> <br />10. <br /> <br />11. <br /> <br />12. <br /> <br />13. <br /> <br />lt. - <br /> <br />The licensee shall comply with the closure/post closure plan dated December 1983 and <br />revised on IUiay 16 and November 21, 19gq and as amended by the County Board on <br />December 15,195q. <br /> <br />The licensee shall provide financial assurance for site operation, closure work (as set <br />forth in Section V, subsection 5.A, B, C, D, E, F, G, H, I, 3, L, and M of the Solid <br />~/aste Ordinance), surface drainage control, and closure period final cover and turf <br />maintenance now by performance bond in the amount of $350,000. <br /> <br />The licensee shall provide financial assurance for other closure period needs, not <br />included in item 11 above, and post closure period needs as set forth in Section !1, <br />subsection 8. B. (1) of the Solid ~/aste Ordinance and that this financial assurance be <br />financed at the rate of $.50/compacted gate yard and $.35/1oose or uncompacted gate <br />yard of solid waste received. This financial assurance shall be provided and amended <br />.quarterly, based upon an estimate acceptable to the 'Department, of the amount o! <br />solid waste to be received during the quarter. Replacement letters o! credit shall be <br />submitted to the Department by the last day o! the first month of each calend~r <br />quarter (3anuary, April, 3uly, and October). Said replacement letters of credit shall <br />include: correction o! the financial assurance, based on actual receipts, for the <br />preceding quarter; an estimate of the quantity of solid waste to be received during the <br />present quarter; and the additional estimated financial assurance for the present <br />quarter. <br /> <br />The licensee shall prepare, and submit to the Department by Npvember 30, 19g~, a <br />preliminary report assessing the extent o! leachate migration by resistivity testing and <br />work plan, acceptable to the Department, for complete assessment of the leachate <br />migration. The work plan may be modified as necessary with approval o! the <br />Department. The licensee shall perform the work in accordance with requirements of <br />the approved work plan. Said complete assessment shall be submitted to the <br />Department no later than 3uae 30, 1985. <br /> <br />The licensee shall prepare, and submit to the Department by November 30, 19gq, a <br />preliminary report assessing deep aquiler monitoring needs. ^ deep aquifer monitoring <br />plan shall be submitted to the Department no later than 3un, 30, 1955. <br /> <br /> <br />