My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/22/1985
Ramsey
>
Public
>
Agendas
>
Council
>
1985
>
Agenda - Council - 01/22/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 9:06:51 AM
Creation date
8/3/2004 9:35:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/22/1985
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />of October 1, lgB4, as specified in Waste Management of I~innesota, Inc. <br />license conditions from October ~ through i)ecember <br /> <br /> As specified in the Anoka (County Solid Waste Ordinance, Section <br />II, Subsection B, the total amount of post-closure financial assurance <br />need not exceed the total remaining capacity x $.5D per gate of <br />compacted waste or $.35 per gate yard of loose, uncompacted waste. <br /> <br /> The estimated remaining capacity of the site as of October ~, ~g84 <br />is 1,010,OOD in-place cubic yards using a 4:1 cover ratio equals <br />758,0DD cubic yards of in-place refuse capacity. Assuming a compaction <br />ratio of 2.2 to ! equals 1,668,0DD cubic yards of gate refuse capacity <br />remain as of October 1, ~g84. Using our 4th'quarter lg85 volume <br />projections of which 28~ of our volume is loose uncompacted waste at <br />$.35 per yard and 72 ~ compacted at $.S0 per yards, I have estimated <br />that the maximum post closure assurance required under the Anoka County <br /> <br />Ordinance is as follows: <br /> <br /> Site Gate Refuse Capacity 1,668,000 <br /> <br /> ~8~ ~ 467,040 x $.35 <br /> <br /> 72~ ~ 1,200,960 X $.50 <br /> <br />$163,500 <br />$600,500 <br />$764,OOO <br /> <br />FACILITY 5 YEAR CLOSURE AND 5 YEAR POST-CLOSURE CARE COST <br /> <br /> The following costs are calculated on an annual basis for the five <br />year closure term and the five year post-closure period. It should be <br />possible to use the same annualized costs in the event that an <br />extension to the post-closure period is required by the Department. <br />Costs are as follows: <br /> <br /> 1. Semi-annual Facility Inspections <br /> <br /> The semi-annual inspection by the operator <br /> and/or owner will be done by a two-person <br /> <br />12 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.