My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/22/1985
Ramsey
>
Public
>
Agendas
>
Council
>
1985
>
Agenda - Council - 01/22/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 9:06:51 AM
Creation date
8/3/2004 9:35:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/22/1985
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />! <br />I <br />I <br />I <br /> <br />7. Groundwater I%nitoring Program <br /> <br />Sampling will be required four (4) times <br />per year for the Groundwater Parameters. <br />Total wells to be sampled ere 11 if the <br />Miller residence well and Well No. 4 are <br />both included. <br /> <br />$6,000/sampling period x 4 periods/year <br /> <br />Operation and Maintenance of Methane <br /> Collection System <br /> <br />This amount is based on the operating <br />costs for the latest period during which <br />the system has been operated. <br /> <br />$300/month electrical x 12 months $3,60D <br />+ $5,000/year maintenance <br />+ $10,ODO/year inspection/labor <br /> <br />9. Gas Monitoring Program <br /> <br />bi-weekly monitoring program of <br />measurements at the various probe sites. <br /> <br />$ ~4,000 <br /> <br />$ 18,60D <br /> <br />20 manhours/month x $20/manhour x 12 months $ 4,BO0 <br /> <br />]0. Pest Control <br /> <br />$ 400 <br /> <br />Monthly site inspection <br /> <br />$30 per month x 12 month~ <br /> <br />SUBTOTAL, ANNUAL POST-CLOSURE COSTS <br /> <br />ADMINISTRATION AND CONTINGENCIES AT 15% <br /> <br />$ 75,200 <br />$ 11,300 <br /> <br /> TOT~ ANNUAL POST-CLOSURE COSTS $ 86,500 <br /> <br />. The following is a schedule using 6[ inflation rate which <br />anticipates the existing site may reach capacity late 1986 or 1987. <br />This is an estimated site life in years. It may increase or decrease <br />based on volumes received. <br /> <br />14 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.