My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/29/1985 - Special
Ramsey
>
Public
>
Agendas
>
Council
>
1985
>
Agenda - Council - 01/29/1985 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 9:51:13 AM
Creation date
8/3/2004 10:05:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
Special
Document Date
01/29/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />i <br />! <br />I <br /> <br />The st[eet section proposed, as shown on Exhibit B, consists of a <br />three inch (3") gravel base with a minimum 1-1/2" bituminous surface. <br />This section is equivalent to a 5-ton design in accordance with the <br />Minnesota Department of Transportation specifications. This street <br />section has been used successfully in other areas of the City. It is <br />estimated that this street section has a life expectancy of 15 years <br />with minimal maintenance. <br /> <br />The proposed construction generally would not include any driveway <br />construction with the exception of a one foot (1') apron which would <br />be provided to protect the edge of the pavement on the rural cross <br />section street. It would be the homeowner's responsibility to extend <br />existing bituminous or concrete driveways to match the street. In <br />special cases, if the street grades are revised to require driveway <br />adjustments, those adjustments would be made as part of the project. <br /> <br />STORM DRAINAGE IMPROVEMENTS <br /> <br />The present storm drainage system appears to be functional with the <br />exception of culvert cleaning, ditch cleaning and the addition of two <br />cross street culverts. The cross street culverts are proposed to be <br />installed across Junkite Street at 140th Lane N.W. and north of i42nd <br />Avenue as shown on Exhibit A. <br /> <br />Some existing driveways presently may not have driveway culverts. <br />While not all driveways would need a driveway culvert, those lots <br />which presently may cause potential flooding problems should be re- <br />quired to install driveway culverts. This work is proposed to be done <br />by the owner of the affected property. <br /> <br /> 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.