Laserfiche WebLink
MAJOR ~O~K <br /> <br />I~ORTB METRO TPJ~FFIC TASK FORCE <br />PROPOSED W0P~: PROCRAM, AN~D SCHEDULE <br /> <br />PROGRAM TASKS <br /> <br />PROPOSED COMPLETION DATE <br /> <br />l. LAND U$£AND DEVELOI~ENTDATAANDAHALYSI$ <br /> <br />Prepare 1984 composite Xand use map of study <br />area; and update TAZ zonal data for total households, <br />total population, total employment, and retail/ <br />service employment (where differences are 20 percent <br />or <br /> <br />~ebruar~ 20 <br /> <br />Prepare year 2000 composite land use map of <br />study area Based on local land use plans and <br />projections; and update TAZ forecasts for above <br />categories (where differences are 20 percent or <br />~ore) . ' <br /> <br />FUNCTIONAL ROAD CLASSIFICATION PLAN <br /> <br />Prepare 1984 functional road classification plan <br />for existing road network that is consistent across <br />the study area. <br /> <br />Prepare year 2000 functional road classification <br />plan showing expected changes and additions to 1984 <br />network and is consistent across the study area. <br /> <br />Ex~mSne the Council's year 2000 computer model road <br />network to determine if changes are needed to make <br />it comparable to the year 2000 study area network. <br /> <br />CANDIDATE BRIDGE LOCATION ANAL¥SIS <br /> <br />Ex~mine the river from 101 to 694 in half-mile segments, <br />and determine possibility of having a bridge location <br />within each segment. <br /> <br />STUDY TKE DIP, ECTION OF TRAVEL WITHIN/T~I~OUGH TttE STUDY AREA <br /> <br />March 27 <br /> <br />February 27 <br /> <br />April 1 <br /> <br />May 8 <br /> <br />Prepare a "desire-line" or "selected-link" network analysisJune 5 <br />using c~puter generated origin/destination figures on a <br />district, zone or subzone basis. <br /> <br />Conduct a limited "real time" origin/destination study using May 15 <br />a license plate survey technique, and use as a check on the <br />computer generated O/D study. <br /> <br />I~.~S EVALUATION <br /> <br />Define alternative crossings and land use configurations <br />to be tested. <br /> <br />Co~ncil/HnDOT c~mputer progrmm generates traffic analysis <br />of the alternatives. <br /> <br />SUMMARY ~EPORT -- A STUDY OF BILI/X~E NEEDS IN THE STUDY AREA <br /> <br />The t,echn:[ca,1 co~mitZeewill produce a draft summary report <br /> area based on local development <br /> <br />Hay 22 <br /> <br />July 15 <br /> <br />August 15 <br /> <br /> <br />