My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/26/1985
Ramsey
>
Public
>
Agendas
>
Council
>
1985
>
Agenda - Council - 02/26/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 9:07:21 AM
Creation date
8/3/2004 11:00:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/26/1985
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROCEEDINGS OF CITY (I]UNCIL <br />FJBLI C REARING <br /> CI~ OF PAMSEY <br /> ANCKA (I~NTY <br /> STATE OF MINNESO~]~ <br /> <br />~he Ramsey City Oouncil conducted a public hearing on Tuesday, January 29, <br />1985 at the Ramsey Municipal Center, 15153 Nowthen Blvd._N.W_.{ <br />Minnesota regarding Drainage Improvement Project $84-17 <br /> <br />Members Present: Mayor Gary Reitman <br /> Oouncilmember Gary Reimann <br /> ~ouncilme~r A1 Sorteberg <br /> Oouncilm~r Jean Schlueter <br /> Councilmember Arnie Cox <br /> <br />Also Present: <br /> <br />City Building Official Clayton Berg <br />City Engineer Peter Raatikka <br /> <br />Mayor Reitman called the public hearing to order at 9:00 p.m. <br /> <br />PRF.qEN~!~TIfIN BY CITY ENGINEER <br /> <br />City Engineer Raatikka made a slide presentation showing Water District $43 <br />and stated the project involves Subdistricts FT4 and FT1; the project proposes <br />to construct storm sewer line from Flintwood I to the ponding area behind the <br />old City Ball and on to the Ru~ River; oontrol structures would be placed at <br />the outlet of each pond and at the outlet of the pond in Subdistrict FT5. Mr. <br />Raatikka stated that construction costs are estimated at $160,650 and <br />construction overhead at $48,200 for a total estimated project cost of <br />$208,850. Mr. Raatikka stated that the proposed assessment would be <br />$784.00/residential acre and $1,263.24 per co~ercial acre amortized over 10 <br />years at an estimated 10% interest rate. ~his assessment proposal would <br />result in a $14,220.76 surplus of funds which will be used for future <br />expansion and improvements in this Water District. If the project is <br />aI~proved, completion date is scheduled for Septe~oer, 1985; assessments can be <br />paid within 30 days after the assessment hearing without incurring any <br />interest. <br /> <br />Oouncilmember Cox inquired if there wouldbe a pipe from the northern oorner <br />of Flintwood I to the control structure and if the ponding area would be dry. <br /> <br />City Engineer Raatikka replied that there would not; there would be a drainage <br />ditch crossing through part of that park land; that channel will be <br />constructed at the same time the storm drainage project is being constructed; <br />the ponding area would be maintained at a certain level. <br /> <br />Councilmember Reimann inquired if this is assessment is a one time thing or <br /> January 29, 1985 <br /> <br />Page 1 of 9 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.