Laserfiche WebLink
5) Where feasible, all selective cuts shall <br />be conducted between September 15 and May 15. <br />If natural regeneration will not result in <br />adequate vegetation cover, areas in which <br />clear cutting is conducted shall be replanted <br />to prevent erosion and to maintain the <br />aesthetic quality of the area; and where <br />feasible, replanting shall be performed in <br />the same spring or the following spring. <br /> <br />c) The selective cutting of trees greater than 4" <br />in diameter may be permitted by local units of <br />government when the cutting is appropriately <br />spaced and staged so that a continuous natural <br />oover is maintained. <br /> <br />2) These vegetative management standards shall not <br />prevent the pruning and cutting of vegetation to the <br />minimum amount necessary for the construction of <br />bridges and roadways and for the safe installation, <br />maintenance and operation of essential services and <br />utility transmission services which are permitted <br />uses o <br /> <br />Ordinance ~85- <br />Page 31 of 31 <br /> <br /> <br />