Laserfiche WebLink
SCHEDULE "C" - 149'PI] AVl';. N.W. & T.H. 4? TURN IANt-;,% (S.A.P. 199-105-02) <br /> Used <br />IItem ~uantity ~X~ Date [Init Price <br /> <br />Exte-:ion <br /> <br /> I1. 2101.502 Clearing <br /> 2. 2101.507 Grubbing <br /> 3.* 2105.501Co~m~n <br /> I Excavation <br /> 4.* 2211.501 Class 5 <br /> Aggregate <br /> <br /> i 5. 2331.508 Bituminous <br /> Material for Mixture <br /> 6. 2331.508 Bituminous <br /> Surface (2331) <br />I 7. 2341.504 Bituminous <br /> Material for Mixture <br /> 8. 2341.508 Bituminous <br />I Surface (2341) <br /> 9. 2357.502 Bituminous <br /> Tack Coat <br />I 10. 2503.511 18" RCP <br /> Class III <br /> 11.* 2503.511 21" BCP <br /> Class III <br />I 12. 2056.508 Standard <br /> Manhole (48") <br />13. 2531.502 Concrete <br />I Curb & Gutter <br /> 14. 2575.501 Seeding <br /> 15. 2575.505 Sod <br /> 2575.511 Mulch <br /> Material Type 1 <br /> 17. 2575.531 Cen, ken <br /> Fertilizer 20-10-10 <br /> Spec. Break into <br /> Existing Manhole <br /> Spec. Centerline Pave- <br /> ment Marking <br /> Spec. Edge of Travel <br /> Lane Marking <br /> 21. Spec. Concrete Drive <br /> Apron <br /> 22.* 2503.511 27" NCP Class III <br /> <br />I16. <br /> <br />I18. <br /> <br /> 19. <br />I 20. <br /> <br /> 40 Trees 40 TR <br /> 40 Trees 40 TR <br /> <br />13,200 Cubic Yards 13200 CY <br />2,150 Ton 1940.94 T <br />61 Ton 16.1 T <br />1,340 TOn 309.7 T <br />54 TOn 0 T <br />900 Ton 0 T <br />500 Gallon 0 GAL <br />44 Linear Feet 43 LF <br />750 Linear Feet IF <br />3 Each 3 EA <br /> <br /> 3,600 Linear Feet 3599 LF <br /> 2 Acre 0 AC <br /> 1,200 Square Yard 0 SY <br /> <br /> 2TOn 0 T <br /> 0.4 TOn 0 T <br /> 1 LumpSum 1 LS <br /> 1,800 Linear Feet 0 LF <br /> 6,000 Linear Feet 0 LF <br /> <br /> 50 Linear Feet 0 IF <br /> 750 Linear Feet 746 LF <br /> <br />Total Bid Schedule "C" - <br /> <br />*Per Change Order <br /> <br />SbT~q~%RY OF BIDDING: <br /> <br />Total Schedule "A": <br />Total Schedule "B": <br />Total Schedule "C": <br /> <br />Total Schedules "A-C": <br />Less 5% Retainage: <br /> <br /> $65.00 /TR <br /> $30.00 /TR <br /> <br /> $1.38 /c~ <br /> <br /> $4.90 /T <br />$200.00 /T <br /> <br /> $10.75 /T <br />$200.00 /T <br /> <br /> $11.00 /T <br /> <br /> $1. lO /GAL <br /> $23.00 /LF <br /> <br /> $2,6S0. O0 <br /> $1,200. O0 <br /> <br />$18,216. oo <br />$9,510.61 <br />$3,220.0C <br />$3,329.22 <br />$0.0C <br />$0. OC <br />$o. oc <br />$989.0C <br /> <br />DELETED <br /> <br />$1,100.00 /EA <br /> <br /> $4.54 /LF <br /> $145.00 /AC <br /> $1.25 /SY <br /> <br /> $130.00 /T <br /> $300.00 /T <br /> $250.00 /LS <br /> <br /> $0.1o /LF <br /> $0.10 /LF <br /> <br /> $10.00 /nE <br /> $37.50 /IF <br /> <br /> $3,300. O( <br /> <br />$16,339.4( <br /> $0.o( <br /> $o.o( <br /> <br /> $0. ol <br /> $0.0~ <br /> <br /> $250.0' <br /> $0.o <br /> $o.0 <br /> <br /> $o.c <br />$27,975.C <br /> <br />$86,929. ~ <br /> <br />$197,978.1 <br /> $46,759.1 <br /> $86,929.' <br /> <br />$331,666. <br />$16,583. <br /> <br />WE ~ PARTIAL PAYMENT OF: $315,083. <br /> <br /> <br />