My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/25/1985
Ramsey
>
Public
>
Agendas
>
Council
>
1985
>
Agenda - Council - 06/25/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 9:37:52 AM
Creation date
8/3/2004 2:13:20 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/25/1985
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE "C" - 149q'd AVE. N.W. <br />Item <br /> <br />& T.H. 47 ~%IRN LANES <br />Estimated Quantity <br /> <br />(S.A.P. 199-105-02) <br /> Used <br /> To Date Unit Price <br /> <br />Exbe~_. ~ion <br /> <br />1. 2101. 502 Clear ing <br />2. 2101. 507 Grubbing <br />3.* 2105.501 Co~ron <br /> Excavation <br /> 4.* 2211. 501 Class 5 <br /> Aggregate <br />5. 2331.508 Bituminous <br /> M~terial for Mixture <br />6. 2331. 508 Bituminous <br /> Surface (2331) <br />7. 2341.508 Bituminous <br /> Material for Mixture <br />8. 2341. 508 Bituminous <br /> Surface (2341) <br />9. 2357.502 Bituminous <br /> Tack Coat <br />10. 2503.511 18" RCP <br /> Class III <br />11.* 2503.511 21" RCP <br /> Class III <br />12. 2056.508 Standard <br /> Manhole (48") <br />13. 2531. 502 Concrete <br /> Curb & (]utter <br />14. 2575. 501 Seeding <br />15. 2575. 505 Sod <br />16. 2575. 511 Mulch <br /> Material %~ype 1 <br />17. 2575.531 Common <br /> Fertilizer 20-10-10 <br />18. Spec. Break into <br /> Existing Manhole <br />19. Spec. Centerline Pave- <br /> ~_nt Marking <br /> 20. Spec. Edge of Travel <br /> Lane Marking <br /> 21. Spec. Concrete Drive <br /> Apro~ <br /> 22.* 2503.511 27" BCP Class III <br /> <br />Total Bid Schedule 'C" - <br /> <br />*Per Change O~der ~1 <br /> <br /> 40 Trees 40 ~R <br /> 40 Trees 40 ~TR <br /> <br />13,200 Cubic Yards 13200 CY <br />2,150 Ton 2055.3 T <br />61 Ton 65 T <br />1,340 Ton 1225.9 T <br />54 Ton 56.1 T <br />900 Ton 959.6 T <br />500 Gallon 235 GAL <br />44 Linear Feet 43 LF <br />750 Linear Feet LF <br />3 Each 3 EA <br /> <br /> 3,600 Linear Feet 3599 LF <br /> 2 Acre 0 AC <br /> 1,200 Square Yard 0 SY <br /> <br /> 2Ton 0T <br /> 0.4 Ton 0 T <br /> 1 Lump Sum 1 LS <br /> 1,800 Linear Feet 0 I~ <br /> 6,000 Linear Feet 0 LF <br /> <br /> 50 Linear Feet 0 LF <br /> 750 Linear Feet 746 [F <br /> <br /> $65.00 <br /> $30.0O <br /> <br />$1.38 <br />$4.90 <br />$200.00 <br />$10.75 <br />$200.00 <br /> <br /> $11.00 <br /> <br /> $1.10 <br /> $23.00 <br /> <br />/TR $2,600.0' <br />;m $1,~0.o <br /> <br />/CY $18,216.0, <br />/T $10,070.9 <br />/T $13,000.0, <br />/T $13,178.4 <br />/T $11,220.0 <br />/T $10,555.6 <br />/C~kL $258.5 <br />/LF $989.0, <br /> <br />DELETED <br /> <br />$1,100.00 <br /> <br /> $4.54 <br /> $145.00 <br /> $1.25 <br /> <br /> $130.00 <br /> $300.00 <br /> <br /> $250.00 <br /> $0.10 <br /> $0.10 <br /> <br /> $10.00 <br /> $37.50 <br /> <br />/EA $3,300.0 <br /> <br />/LF $16,339.4 <br />/AC $0.0 <br />/sY $o.c,' <br /> <br />/"T $0.0~ <br />/W $0.0 <br />/%S $250. C <br />/nF $0.C <br />/LF $0.C <br /> <br /> /nE $0.~ <br /> /LF $27,975.{ <br /> <br /> $129,152. ! <br /> <br />SL~Y OF BIDOING: <br /> <br /> T~tal Schedule "A": <br /> Total Schedule "B": <br /> T~tal Schedule "C": <br /> <br /> 7~Dtal Schedules "A-C": <br /> Less 5% Retainage: <br /> bess Pay Estimate No. 1: <br /> <br /> WE RF~ND PARTIAL PAYMENT OF: <br /> <br />please verify the an~)unt of any previous payments prior to making pa~ent. <br /> <br />$200,815. <br /> $49,984o' <br />$129,152.~ <br /> <br />$379,953~ <br /> $18,997~ <br />$315,083. <br /> <br />$45,872. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.