Laserfiche WebLink
I <br />! <br /> <br />Honorable Chairman a~d Board Members <br />City of Ramsey <br />15153 Nowthen Boulevard N.W. <br />Ramsey, Minnesota 55303 <br /> <br />Re: River's Bend - Trunk San. Sew. & Lateral San. Sew. & Watermain <br /> Contractor: Arcon Construction Company, Inc. <br /> Bid Amount: $914,011.25'* <br /> Award Date: September 26, 1984 <br /> Completion Date: May 10, 1985 <br /> Percent Completed: 100% <br /> <br />June 18, 19B5 <br /> <br />Dear Board Me, rs: <br /> <br />The following work has ~n completed on the above referenced project bY Arcon Construction <br />Company, Inc. <br /> <br />SCHEDULE "A" - ~ SANITARY SEWER (Improvement Project 84-12) <br /> <br />m item <br /> <br />Depth Estimated Quantity <br /> <br />Used to <br /> Date Unit Price Extension <br /> <br />1. 30" R.C.P. Class V <br />2. 30" R.C.P. Class V <br />3. 12" PVC Pipe <br />4. 12" PVC Pipe <br />5. 12" PVC Pipe <br />6. 12" ~ Pipe <br />7. 12" 1AC Pipe <br />8. 12" lAC Pipe <br />9. 12" D.I.P. <br />10. Jacking Under S.T.H. <br />11. Standard Manhole <br />12. Special Manhole (60" Dia.) <br />13. Extra Depth of Manhole <br /> (Over 10') <br />14. Connect to M.W.C.C. Sewer <br />15. Drop Structure <br />16. Riser Pipe for Drop <br /> Structure <br />17. 4" Service Connection <br /> (12" Wye) <br />18. 4" Service Pipe <br />19. Seeding <br />20. Pipe ~stiw <br />21. Crushed Rock for Bedding <br />22. Fertilizer <br />23. Mulch <br />24.* Double 6" Service <br /> Connection <br />25.* Single 6" Service <br /> Connection <br />26.* 4" Service Connection <br /> (30" RCP) <br />27.* 6" Service Pipe <br /> <br />20-22 <br />22-24 <br />10-12 <br />12-14 <br />14-16 <br />16-18 <br />18-20 <br />20-22 <br />14-16 <br />{47 Varies <br /> <br />* Per Change Order No. 2 <br />**Per Change Order No. 4 <br /> <br />650 Linear Feet 590 LF <br />750 Linear Feet 740 LF <br />15 Linear Feet 0 LF <br />105 Linear Feet 80 LF <br />850 Linear Feet 845 LF <br />360 Linear Feet 340 LF <br />410 Linear Feet 303 LF <br />530 Linear Feet 648 IF <br />80 Linear Feet 70 LF <br />65 Linear Feet 65 LF <br />16 Each 16 EA <br /> <br /> 150 Linear Feet 156.5 LF <br /> 1 LumpSum 0 LS <br /> 6 Each* 8 EA <br /> <br /> 40 Linear Feet* 85 LF <br /> <br />13 Each 13 EA <br />630 Linear Feet* 320 LF <br />8 Acres 1.3 AC <br />3815 Linear Feet 0 LF <br />1000 Ton 100 T <br />2Ton 0.3T <br />12Ton 2T <br /> <br /> 2 Each 2 EA <br /> 9Each 9EA <br /> <br /> 2Each 2EA <br /> 500 Linear Feet 595 LF <br /> <br />$68.60 /LF $40,474.0£} <br />$68.60 /LF $50,764.0C <br />$33.95 /LF $0.0C <br />$33.95 /LF $2,716.0< <br />$35.40 /LF $29,913.0i <br />$35.40 /LF $12,036.0< <br />$37.35 /LF $11,317.0[ <br />$37.35 /LF $24,202.8[ <br />$44.40 /LF $3,108.0( <br />$115.00 /LF $7,475.0< <br />$850.00 /EA $13,600.0( <br />$1,800.00 /FA $1,800.0< <br /> <br />$48.00 /LF $7,512.0~: <br />$100.00 /LS $0. <br />$750.00 /EA $6,000.0~. <br /> <br /> $40.00 /LF $3,400.0.~ <br /> <br />$50.00 /EA $650.0~ <br />$9.20 /LF $2,944.0 <br />$195.00 /AC $253.5 <br />$0.20 /nE $0.(~ <br />$0. O1 /T $1. £~: <br />$325.00 /T $97. ?- <br />$105.00 /T $210. C <br /> <br />$195.00 /EA $390. £: <br /> $0.0 <br />$175.00 /EA $1,575. (~ <br /> $0. C <br />$150.00 /FA $300. [' <br />$10. D ~ $6,069. (' <br /> <br />$226,807.~ <br /> <br /> <br />