My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/24/1985
Ramsey
>
Public
>
Agendas
>
Council
>
1985
>
Agenda - Council - 09/24/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 9:41:12 AM
Creation date
8/4/2004 9:37:36 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/24/1985
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. <br /> 5. 2341. <br /> 6. 2341. <br /> 7.2357. <br /> 8. 2531. <br /> 9. Spec. <br />I0. 2575. <br /> 1. 2575. <br /> <br />2112.501 Subg[ack. Pzepa[ation <br />22]].50] Class 5 Aggregate <br />2331.504 Bituminous Material for Mix <br />2331.508 Bituminous Surface (2331) <br /> <br />504 Bituminous Material for Mix <br />508 Bituminous Surface (2341) <br />502 Bituminous Tack Coat <br />502 Concrete Curb & Gutter <br /> Concrete Valley Gutter <br />501 Seeding <br />501 Seeding <br /> <br /> 12. 2575. 505 Sod <br /> 3.2575.511 Mulch Material Type ! <br /> 4. 2575. 531 Con~n. Fertilizer 20-10-10 <br /> 15.Spec. Centerline Pavement Marking <br />t. 6.Spec. Edge of Travel Lane Marking <br />.7.Spec. Concrete Drive Apron <br />18. Spec. Topsoil <br /> 9.Spec. Install Culvert @ C.R. 116 <br /> 0.Spec. Subgrade Preparation C.R. 116 <br /> <br />ALTERNATIVE SCHEDULE "D": <br /> <br />SCHEDULE "E" - FLI~ HILLS 2ND ADOITION <br /> <br />item <br /> <br />]5.5 <br />],800 <br />48 <br />1,000 <br />47 <br />75O <br />425 <br />3,000 <br />27 <br />2 <br />1 <br />500 <br />3 <br />0 <br />1,550 <br />4,100 <br />240 <br />7OO <br />1 <br />1 <br /> <br />Road Stat ions ]5.5 /RS <br />Ton ]680 /T <br />Ton 39.6 /T <br />Ton 880.43 /7' <br />Ton 0 /T <br />Ton 0 /T <br />~]lon 0 /~ <br />Linear Feet ~05 /~ <br />Linear Feet. 27 /~ <br />Ea~ 0 /~ <br />Acres 0 /~ <br />~uare Yards 0 /~ <br />~n 0 ~ <br />~n 0 ~ <br />Li~ar Feet 0 ~ <br />Linear Feet 0 /~ <br />Li~ar Feet 271 ~ <br />Cubic Yards /~ <br /> <br />(Project 84-1 ) <br />Estimated Used <br />Quantity To Date <br /> <br />$120.00 /RS <br /> $6.O0 /T <br />$210.00 /T <br /> $12.75 <br />$210.00 /T <br /> $13.00 /T <br /> $1.25 'GAL <br /> $4.32 /IF <br /> $9.30 /L~ <br />$250.00 <br />$240.00 /AC <br /> $1.50 /sY <br />$125.00 /T <br />$300. oo <br /> $0.15 /n~ <br /> $0.15 <br /> $7.50 <br /> $1.00 <br />$400. oo /Is <br />$600.00 /LS <br /> <br />Unit Price <br /> <br />$1,860.00 <br />$10,080.00 <br />$8,3]6.00 <br />$11,225.48 <br /> $o.oo <br /> $o.oo <br /> $0.00 <br />$12,549.60 <br /> $251.10 <br /> $o.oo <br /> $o. oo <br /> $0.oo <br /> $0.00 <br /> $o. oo <br /> $o.oo <br /> $o.o0 <br /> $2,032.50 <br /> $o.oo <br /> $4O0.O0 <br /> $6O0.OO <br /> <br />$47,314.68 <br /> <br />Extension <br /> <br />I <br />I <br />I7.Seeding <br /> 8.Mulch Type I <br /> 9.Conm~rcial Fertilizer <br />iL0.Topsoil <br /> <br /> TOTAL SCHEDULE "E~: <br /> <br />1.Subgrade Preparation 21 <br />2.Class 5 Aggregate 1,500 <br />3.Bituminous Surface (2341) 850 <br />4.Bituminous Material for Mix (2341) 53 <br />5.Concrete Curb & Gutter, Surmountable 4,400 <br />6.Conc. Curb & Gutter (B-618) 100 <br /> 2 <br /> 3 <br /> 0 <br /> 900 <br /> <br />Total <br /> <br />Total <br />Total <br />Total <br />Total <br /> <br />Schedule <br />Schedule <br />Alternative Schedule "C": <br />Schedule <br />Schedule <br /> <br />Total All Schedules: <br />bess 5% Retainage: <br />Less Previous Payments: <br /> <br /> We Reco~nend Partial Payment. of: <br />JPlease verify the amount, of previous payments, <br /> <br />Road Stations 21 /RS $90.00 /'RS <br />Tons 978 /T $4.50 /T <br />Tons 657.6 /T $10.00 /T <br />Tons 37.5 /T $205.00 /T <br />Linear Feet 3759 /LF $4.15 /LF <br />Linear Feet 100 /LF $6.00 /LF <br />Acres 0 /AC $240.00 /AC <br />Tons o /T $125.00 /T <br />Tons 0 /T $300.00 /T <br />Cubic Yards 0 /CY $1.00 /CY <br /> <br />if any, prior to making payment. <br /> <br />$1,890.00 <br />$4,401.00 <br />$6,576.00 <br />$7,687.50 <br />$15,599.85 <br />$600.00 <br /> $o.oo <br /> $0.oo <br /> $o. oo <br /> $0.oo <br /> <br />$36,754.35 <br /> <br /> $41,111.80 <br />$141,132.10 <br />$117,139.50 <br />$47,314.68 <br />$36,754.35 <br /> <br />$383,452.43 <br /> $19,172.62 <br />$312,962.68 <br /> <br />$51,317.13 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.