My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/22/1985
Ramsey
>
Public
>
Agendas
>
Council
>
1985
>
Agenda - Council - 10/22/1985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 9:43:15 AM
Creation date
8/4/2004 10:22:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/22/1985
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F~,or'n~,ey Landfill Ad t4o~' <br />October II, 1985 <br />Page .5 <br /> <br />Two special sections of the report shall be preparedl one will detail the methodology <br />being utilized in arriving at the various findings together with pertinent criteria~ and the <br />second shall be a summary to contain the conclusions and recommendations of the <br />consultant in respect to the findings of the study. One element of the conclusions shall <br />be a finding as to whether, if the City of Romsey had similar commercial/industrial <br />development, would the landfill have the same effect upon market values. <br /> <br />Various maps~ graphs, charts~ aerial photographs~ and ground level photographs will be <br />prepared for inclusion in the report and to make the results of the study easily <br />communicated to interested groups. Slides will be prepared of all pertinent graphic <br />materials. <br /> <br />CLIENT'S RESPONSIBILITIES <br /> <br />The Ad Hoc Committee will make themselves available to participate in the rating scale <br />procedure referenced in parts i~ A and B. In addition, the client will furnish to the <br />consultant (~11 engineering data available as to the impact of potential water pollution <br />problems and any subsequent need for accelerated utility installation. <br /> <br />TERt,/I5 AND CONDITIONS <br /> <br />K. Bordner Consultants is prepared to began immediately upon receipt of authorization <br />to proceed. A prelimir~ry draft will be prepared for review by the Landfill Ad Hoc <br />Committee by December I, 1985. It should be noted, however, that in our experience, a <br />study of this complexi'ty will take generally four to six weeks to complete. Therefore, <br />the completeness and finality of this draft will depend upon the date upon which <br />authorization to proceed is received. The final draft and slides can be completed within <br />twenty days after the draft is approved. <br /> <br />I<. Bordner ConsuJtants agrees to complete the study as described in this proposal for the <br />following fixed fees: <br /> <br />A. I Local Comparison ~S,500.00 <br />B. II Metro Area-Wide Comparison $8,500.00 <br />C. One hundred copies of the final report with slides $2~500.00 <br /> TOTAL $ I ~,S00.00 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.