Laserfiche WebLink
information. The Framework was then merged with the Master Plan to have one guiding <br /> document for the area. <br /> In 2013, the Metropolitan Council conducted a study called the"Market and Financial Viability <br /> Analysis and Implementation Strategy for Transit-Oriented Development" for all Northstar stations <br /> including the Ramsey Station.This planning work was funded through a Metropolitan Council <br /> Corridors of Opportunity grant, a portion of which was funded through a Sustainable Communities <br /> Regional Planning grant from the Department of Housing and Urban Development.The proposed <br /> project is consistent with previous HUD-funded investment strategies and planning. <br /> In addition to land use planning,the cities of Ramsey and Anoka, along with Anoka County and the <br /> Minnesota Department of Transportation completed the Highway 10 Access Planning Study in 2014. <br /> Environmental Sustainability <br /> I. Reduce energy use and air or water pollution <br /> Climate change is a result of increased carbon dioxide production and one of the sources of this <br /> pollutant is vehicle emissions.By reducing the congestion causing vehicles to stop and start,the <br /> proposed project will reduce emissions of vehicles traveling on US 10. Furthermore,the proposed <br /> project will facilitate use of the Northstar Commuter Rail Station and further build out of the COR <br /> so that as the city of Ramsey grows, a greater share of trips in the area can be made on foot, by <br /> bicycle,or by transit,reducing per capita carbon emissions. <br /> II. Avoid adverse environmental Impacts to air or water quality,wetlands,and endangered <br /> species <br /> An Environmental Assessment was previously completed for the Highway 10 corridor between <br /> Sunfish Lake Boulevard and Ramsey Boulevard. There are no wetlands in the project area. The <br /> project has the potential to impact six (6) monitoring wells related to a previous train derailment <br /> and soil contamination. This soil contamination has been properly mitigated per the direction of <br /> the Minnesota Pollution Control Agency. Finally,the Environmental Assessment notes numerous <br /> low and medium risk properties within the project corridor. Low risk properties warrant no <br /> further study while medium risk properties may warrant further study. <br /> Additionally,an additional AUAR was completed for The COR development in 2005,updated <br /> 2014. This AUAR was utilized for the previous improvements for this exact intersection. Based <br /> on this information,it is assumed that the project will have no troubles securing a Finding of No <br /> Significant Impact (FONSI). <br /> The existing conditions of the roadway do not provide significant habitat for wildlife. Therefore the <br /> proposed conditions are not anticipated to change wildlife use in the area. Information from the <br /> Department of Natural Resources (DNR) Natural Heritage Database indicates that one state-listed <br /> threatened species,the Blanding's turtle,is known to have occurred in the area. The DNR's fact <br /> sheet regarding Blanding's turtles will be provided to contractors and if turtles are in harm's way <br /> during construction,they will be moved. Surmountable curbs will also be used during construction <br /> to facilitate movement of turtles. <br /> III. Provide environmental benefits,such as brownfleld redevelopment,ground water recharge <br /> In areas of water scarcity <br /> US 10/CSAH 56 FAS LANE Application 20 City of Ramsey <br />