Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />experience increa~d §r(~th %o 50 b~d &ircraft ~er ~ 20 ~ t~ fr~ <br />ass~ 1989 1~ ~e ~tru~ion y~r for ~r~ents~ ~re le ~tentl~ for <br />~itio~ ~ aircr~t at ~~ ~u~ ~ ~i~~ fr~ ~~ ~ <br />~ ~ty. ~1 o~ratio~ are ~tici~ to rt~ fr~ 8,520 ~ 19~ ~ <br />36,920 ~ ~e y~r 2005. <br /> <br />~ Of Facility - ~e Airport Master Plan addresses developing a m~ <br />facility that will meet minimum State and Federal criteria for funding <br />participation. ~he facility would involve a 3300' x 60' runway that would <br />serve single and light twin engine aircraft 12,500~ and under. The clear zones <br />would be twice as long as those at Crystal; there would be some land use zoning <br />restrictions affecting property near the airport and it's approaches. <br /> <br />Ai _rport Layout - Mr. Otto presented an map illustrating the airport layout <br />in relationship to the surrounding area. In order to achieve minimum <br />clearanoes over railroad tracks, it was neoessary to shift runway alignment to <br />the north and relocate County Road ~116. Adequate clearances for a crosswind <br />runway could not be attained at Gateway and the Airport Master Plan addresses <br />a single primary runway. In the southern clear zone there are telegraph, <br />telephone and utility poles that would be buried; there are trees that would <br />have to be cleared; one oo~mercial structure r~d for acquisition <br />(removed or relocated). On the north end, there are adequate clearances over <br />County Road ~56, but there are a nunber of residences reoc~m~ded for <br />acquisition. A lot of property would qualify for a lifetime lease back <br />arrangement but ultimately all structures in the clear zones would be scheduled <br />for removal. With the exception of one it~, it looks like all obstructions <br />can be alleviated from the clear zones. <br /> <br />Property Recommended For Acqu_ isition - Approximately 230 acres would have to <br />be acquired for runway landing area, building development area, clear zones and <br />additional land beyond the clear zone requirement impacted by Minnesota Land <br />Use Safety Zones. A minimal amount of land can be acquired by easement and the <br />remainder would be acquired in fees. ~he acquisition process is well defined <br />by Federal and State agencies. <br /> <br />Staging Of Development - Stage I includes acquisition of land, develoimmnt of <br />runway and a portion of the connecting taxiways, turfing a parallel taxiway <br />system and some building area development. ~l~e earliest Stage I could occur is <br />1989. Stage II includes development of aircarft parking area, auto parking <br />area, arrival/departure area and the first stage of hangar development. Stage <br />III would provide for airport expansion. <br /> <br />County (lmmissioner Hass irguired if relocation of County Road {116 would be <br />included in Stage I. <br /> <br />Mr. Otto replied that relocation of #116 would be in Stage I; Stage I is geared <br />around developing and protecting the airport site area. <br /> <br />D~velo_r~ent Costs - See Attachment I. <br /> <br />~ Financing methods include: 1) G. O. Bonding; 2) Revenue <br />Bondi~; 3) Tax Increment Financing; 4) New progr~s involving neighboring <br />municipalities entering into lease/purchase agreenents; 5) Accumulated cash. <br /> <br />May ~, 1985 <br /> <br />Page 2 of 8 <br /> <br /> <br />