My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/25/1978
Ramsey
>
Public
>
Agendas
>
Council
>
1978
>
Agenda - Council - 09/25/1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:54:30 PM
Creation date
8/5/2004 2:04:08 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/25/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
civil <br />municipal <br />planning <br />environmental <br />land surveying <br />geotechnics <br /> <br />consu-l-'n9 eng' d'vers'f'ed ' <br /> liqUOr'S I'-'1C, <br /> p.o. box j. osseo, minnesota 55369 ~:~ (612) 425-218rl ' <br /> <br />September 20, 1978 <br /> <br />Mr. Lloyd Schnelle, City Administrator <br />City of Ramsey <br />15153 Nowthen Boulevard N.W. <br />Anoka, Minnesota 55303 <br /> <br />Re: School Playground Plan <br /> <br />Dear Lloyd: <br /> <br />As requested, we have written this letter to confirm our estimated prices for <br />construction of the school playground plan presented at your September 11, 1978, <br />council meeting. <br /> <br />The proposed plan consisted of grading the area west of the existing ballfields <br />for use as two regulation size softball diamonds or a regulation soccer field. <br />Estimated construction costs for the project are as follows: <br /> <br />Cost Estimate <br /> <br />Grading <br />Remove & Replace Existing Topsoil <br />Furnish and Install Additional Topsoil <br />Furnish and Install Agricultural Lime <br /> <br />$10,500/' <br /> 1,500 <br /> 2,000 <br /> 2,000 <br /> <br />TOTAL CONSTRUCTION COST <br /> <br />$16,000 <br /> <br />The above cost was based on the assumption that the majority of the required topsoil <br />would be available on the site. The above cost estimate also did not include seeding, <br />benches, backstops, or fencing, since it was determined at an earlier meeting that <br />these items could be completed by city personnel. <br /> <br />If the city and/or school decides to prQceed with the project we could prepare planS <br />and specifications, take bids and provide construction supervision for a cost of <br />$1,600. In addition, we could provide construction staking and inspection at our <br /> <br />normal hourly rates. <br /> <br />keith caswell jr. LJ darrell schneider ~, richard sha <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.