Laserfiche WebLink
e) Street sweeping <br />f) Seal coating <br /> <br /> ("Stage II Improvements") . <br /> <br />12. Payment for Stage II Improvements. The CITY will install in the Plat the Stage II <br /> Improvements. The DEVELOPER shall also deposit an amount that is determined by the <br /> CITY to be adequate to aid in the operation and maintenance of street lights in locations <br /> within the Plat determined by the City Engineer and installed by Coxmexus for the first three <br /> (3) years after final plat approval. The CITY will biI1 residents in the Plat at least quarterly <br /> for street light maintenance and operation costs; billing wi'Il be initiated at the time a <br /> residence connects to municipal water and sanitary sewer. The DEVELOPER will pay io <br /> the CITY an amount equal to 100% of the City Engineer's estimated construction cost of the <br /> items prior to recording of the final Plat. The City Engineer's estimated cost of construction <br /> <br />a) Street striping and signing (3~$200) $600 <br />b) Traffic signing (2 ~,$200) $400 <br />c) Street lights (2 ~$1500) $3,000 <br />d) Street light maintenance (2 ~$270) $540' <br />e) Street sweeping $300 <br /> <br />("Stage II Improvements") Total $4,840 <br /> <br />13. Hard Surfaced Driveways. Hard surfaced driveways (bituminous or concrete) are a <br /> requirement for each lot in the Plat. Said improvement shall be installed by the building <br /> permit applicant or the homeowner at the time the Certificate of Occupancy is issued or as <br /> soon ihereafter as possible, weather permitting. In the event this improvement is not timely <br /> installed on a lot, the DEVELOPER and/or the DEVELOPER'S assign(s), a~ees that the <br /> CITY may install said improvement on the lot and specially assess the cost therefore against <br /> the lot. The DEVELOPER hereby waives all right to a public hearing and other statutory <br /> rights or City Charter rights granted a property owner relating to special assessments, <br /> including the right to appeal the special assessment for installation of the hard surfaced <br /> driveway. In addition, the DEVELOPER grants the CITY a license to enter on each lot of <br /> the Plat in order to install the improvement described in this paragraph if the same has not <br /> been previously constructed. <br /> <br />14. Street Cleaning. After the street surfacing iS installed, the DEVELOPER shall clear any <br /> soil, earth, or debris from the streets within the Plat resulting from any construction within <br /> the Plat by the DEVELOPER or its successors and assigns. From time to time, the CITY <br /> may remove accumulations of soil, earth and debris from the streets resulting from the <br /> construction of the Plat. It shall be the DEVELOPER'S responsibility, to pay the costs <br /> associated with this necessary street cleaning. [nvoices from the CITY to the DEVELOPER <br /> fbr such costs shall be paid within fifteen (15) days of the date of invoice. <br /> Alpine Acres Subdivision <br /> Development Agreement <br /> Page 5 of 12 <br /> <br />-337- <br /> <br /> <br />