My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/12/1979
Ramsey
>
Public
>
Agendas
>
Council
>
1979
>
Agenda - Council - 03/12/1979
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:36:17 PM
Creation date
8/10/2004 2:22:44 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/12/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
civil <br />municipal <br />planning <br />environmental <br />land surveying <br />geotechnics <br /> <br />March 5, 1979 <br /> <br />consu t ng eno neers d vets t ed nc, <br /> p.o. boxj. osseo, minnesola55369 L~ (612) 425-2161 <br /> <br />Mr. Kenneth Peterson, Chairman <br />Ramsey Planning and Zoning Commission <br />15153 Nowthen Boulevard <br />Anoka, Minnesota 55303 <br /> <br />Re: Gateway North Industrial Park <br /> Plat Two Preliminary Plat <br /> <br />Dear Mr. Peterson: <br /> <br />Since our last letter of February 1, 1979 in regard to the above referenced plat, <br />we have met with the Anoka County Highway Engineer Paul Ruud and the developer's <br />engineer to solve the potential drainage problem. The developer has also provided <br />first floor elevations of existing buildings in the area as requested in our <br />February 1, 1979 letter. <br /> <br />The first floor elevations of the existing buildings confirm that there is a potential <br />flooding problem if the entire area develops and the existing drainage outlet under <br />newly constructed Industry Avenue is not enlarged. However, since the Comprehensive <br />Storm Drain Study for the ci:ty has not been completed the exact size of culvert under <br />Industry Avenue cannot be determined at this time. Therefore, we would recommend <br />approval of the proposed plat with the contingency that the developer escrow funds <br />for the installation of a larger culvert under Industry Avenue at a later date. The <br />Anoka County Engineer is agreeable to this solution. He also indicated in our meeting <br />on February 27, 1979 that the county would allow Industry Avenue to be open cut for <br />installation of the culvert provided it is completed prior to construction of the <br />wearing course and bituminous shoulders. The wearing course and the bituminous ~..~. <br />shouldering on Industry Avenue is tentatively scheduled for 1980. <br /> <br />Street grades and culverts within the plat have been resized to handle the projected <br />runoff from the plat. However, in review of the revised grading plan ~e found that <br />the proposed culvert under 141st Avenue N.W. was not consistent with the culvert shown <br /> <br />keith caswell jr. re darrell schneider ¢~ richard sha <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.