My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 01/10/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 01/10/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:02:40 PM
Creation date
1/11/2017 9:10:59 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
01/10/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
631
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
no. <br /> Our Mission: To work"ettrer to resposibty grow our community,and to provide quality,cost-effective.and efficient government services. <br /> CC Regular Session 7.4. <br /> Meeting Date: 01/10/2017 <br /> By: Bruce Westby,Engineering/Public <br /> Works <br /> Information <br /> Title: <br /> Adopt Resolution 917-01-016 Ordering Feasibility Report for Improvement Project 917-02,Rivers Bend Street <br /> Reconstructions <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to adopt Resolution 917-01-016 ordering preparation of a Feasibility Report for the <br /> Rivers Bend Street Reconstruction improvements,proposed to be completed as part of the 2017 Street Maintenance <br /> Program. <br /> Background: <br /> City staff previously identified various street segments whose Pavement and Surface Evaluation Rating(PASER) <br /> values indicated that these streets should receive mill and overlay improvements in 2017 to maintain the streets in <br /> the most cost-effective manner. These street segments are listed below, and are generally shown in Figure 1 <br /> attached. <br /> • 147th Lane—Xkimo Street to Waco Street <br /> • 148th Avenue—Yakima Street to Xkimo Street <br /> •Xkimo Street— 147th Lane to 149th Avenue <br /> •Yakima Street— 148th Avenue to 149th Avenue <br /> On December 13,2016, Staff requested Council authorization to prepare a Feasibility Report for a proposed 2017 <br /> Mill and Overlay Improvements project designated as City Improvement Project 917-02.As was noted in the case, <br /> Staff proposed to complete pavement corings while preparing the Feasibility Report to minimize risks associated <br /> with existing pavement thickness issues encountered while overlaying Sunwood Drive in 2016 which resulted in <br /> increased project costs. These issues occurred when the milling machine encountered existing pavement that was <br /> less than 2"thick. This resulted in the need to excavate a couple of inches of existing aggregate base material so <br /> patches of new bituminous base course could be constructed to provide a surface for the new bituminous wear <br /> course to adhere to. Twelve pavement corings were therefore taken on these streets which unfortunately showed <br /> that insufficient pavement exists to complete mill and overlay operations on as originally proposed. <br /> Staff is therefore requesting Council authorization to prepare a Feasibility Report for reconstructing the entire <br /> existing bituminous pavement section on these streets instead. Staff will attempt to minimize project costs by <br /> replacing only damaged concrete curb and gutter, similar to what was proposed with the mill and overlay <br /> improvements. Staff will also compare estimated costs for completing a traditional pavement removal and <br /> replacement project where the existing pavement is broken into chunks and hauled off site,versus a pavement <br /> reclamation project where the existing pavement is ground up on site and either hauled away for use on another <br /> project, or mixed with some of the existing aggregate base to strengthen the base for the new pavement section, <br />
The URL can be used to link to this page
Your browser does not support the video tag.