Laserfiche WebLink
AGENDA FOR PUBLIC HEARINGS <br /> 10/9/79 <br /> <br />Recap of project (Engineer) <br /> <br />Cost summary including interest rate and that they <br />have 30 days to pay without intereSt. (Engineer) <br /> <br />Time runs from public hearing or until November 8, <br />1979, which is last date total project can be paid <br />without interest. <br /> <br />Questions <br /> <br />Mayor should advise that assessment role will be <br />adopted later in evening. <br /> <br />}Aayor must be certain that the hearings are kept on <br />time. <br /> <br />POLICY ON DRIVEWAY PAVING: <br /> <br />'That in spring 6f 1978 the Council adopted a verbal policy <br />to the effect that if an individual had an existing, paved <br />driveway within three feet of the travelled portion of <br />street, the contractor would put in this three feet to <br />match up, but if no driveway within three feet, then no <br />paving, not even the first three feet, would be put in. <br /> <br /> <br />