Laserfiche WebLink
PAY ESTIMATE NO. 3 OWNER <br />SUNWOOD DRIVE N.W. AND RHINESTONE STREET NW <br /> <br />Bid Schedule "C" - S.A.P. 199-109-01 - Rhinesto,le Street NW Continued <br /> <br />ITEM CoNTRAcT USED TO- <br /> ITEM QTY UNIT UNIT COST EXTENSION <br />NO. AIVIOUNT DATE <br />213 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 49 LF $144.55 $7,082.95 31.9 $4,611.15 <br />214 CONSTRUCT DRAINAGE STRUCTURE DESIGN 54 - 4020 11 LF $202.58 $2,228.38 9.1 $1,843.48 <br />215 CONSTRtJCT DRAINAGE STRUCTURE DESIGN 60 - 4020 10 LF $240.94 $2,409.40 8.6 $2,072.08 <br />216 CONSTP, UCT I)RA[NAGE STRUCTURE DESIGN 66 - 4020 8 LF $284.46 $2,275.68 12.7 $3,6'12,64 <br />217 CONSTRUCT DRAINAGE STRUCTURE DESIGN 72 - 4020 12 LF $355.03 $4,260.36 9.8 $3,479.29 <br />218 CONSTRUCT DRAINAGE STRUCTUItE DESIGN 78 - 4020 19 LF $354.94 $6,743.86 13.9 $4,933.67 <br />219 CONSTRUCT DRAINAGE STRUCTURE DESIGN 84 - 4020 7 LF $456.75 $3,197.25 17.3 $7,901.78 <br />220 CONSTRIJCT DRAINAGE STRUCTURE DESIGN 96 - 4020 40 LF $544.76 $21,790.40 15.6 $8,49g.26 <br />221 CASTING ASSEMI31,1ES SPECIAL 30 EACH $479.25 $t4,377.50 $0.00 <br />222 CONSTRUCT DRAINAGE STRUCTIJRE DESIGN SPECIAL I 6 EACH $376.58 $2,259.48 3 $1,'120.74 <br />223 4" CONCRETE, WALK 23000 SF $2.01 $46,230.0(1 $0.00 <br />224 6" CONCRETE WALK 2500 SF $4.33 $10,825.00 $0.00 <br />225 CONCRETE ClIP, Fi AN[) GUTTER DESIGN B618 2430 LF $7.59 $18,443.70 $0.00 <br />226 PEDESTRIAN CURB RAMP 24 EACH $319.92 $7,678.08 $0.00 <br /> <br /> 227 SIGN I'ANELS TYPE C 188.5 SF $22.19 $4,182.82 $0.00 <br /> <br /> 228 PAVF, MENT MESSAGE (ONLY) EPOXY 4 EACH $200.00 . .$800.00 $0.00 <br /> 229 PAVEMENT MESSAGE (RIGHT ARROW) EPOXY 3 EACH $144.48 $433.44 $0.00 <br /> 230 PAVEMENT MESSAGE ti. EFT Al{ROW) EPOXY 5 EACH $144.48 $722.40 $0.00 <br /> 231 F & I SIGN PANELS TYPF, "D" 3 EACH $258.00 $774.00 $0.00 <br /> 232 4" SOLID LINE WHITE- PAINT 1850 LF $0.41 $758.50 $0.00 <br /> 233 24" SOLID LINE WHI']'E- PAINT 20 LF $3.87 $77.40 $0.00 <br /> 234 36" SOLID LINE WItlTE- PAINT 50 LF $5.68 $284.0{] $0.00 <br /> 235 4" BROKEN LINE YEI.LOW,- PAINT 150 LF $0.42 $63.00 $0.00 <br /> 236 4" DotJBLF- SOLID LINE YELLOW - PAINT 1150 LF $0.85 $977.5{] $0.00 <br /> 237 24" SOLID LINE YELLOW - PAINT 180 LF $2.58 $464.413 $0.00 <br /> 238 4" SOLID LINE WHITE - EPOXY 4100 LF $0.50 $2,050.0£ $0.013 <br /> 239 24" STOP LINE WHITE - EPOXY 30(~ LF $7.22 $2,166.0( $0.00 <br /> 240 36" SOLID I,INE WItlTE - EPOXY 570 LF $8.67 $4,941.9£ $0.001 <br /> 241 4" BROKEN LINE YELl,OW - EPOXY 1800 LF $0.51 $918.0( $0.00i <br /> 242 4" DO/JBLE SOl,ID LINE YELLOW - EPOXY 600 LF $1.01 $606.0( $0.00 <br /> 243 24" SC)LID LINE YELLOW - EPOXY 50 LF $5.68 $284.00 $0.00 <br /> 244 INSTALL 4"-6" PVC (SCII 40) CONDUIT 1000 LF $6.45 .$6,450.00 $0.00 <br /> <br />G:lSharedDocslMumcipallARamseyl <br />3171/ra3171 po.xlsPAY ESTIMATE NO. 3 PE-8 Rev. 4/14~04 <br /> <br /> <br />