Laserfiche WebLink
CITY COUNCIL WORK SESSION <br /> <br />Topic Report: Consider Ramsey Town Center Lighting fixture <br /> <br />By: Brian E. Olson, Assistant Director of Public Works / Principal City Engineer <br /> <br />Background: <br /> <br />Pm'suant to the Master Development Agreement for the Ramsey Town Center, the Master <br />Developer has the responsibility to construct the streetscaping associated with the Municipal State <br />Aid (MSA) roads that include Sunwood Drive, Rhinestone Street and Zeolite Street. <br /> <br />We have worked on this streetscaping plan for the Municipal State Aid roads over the past few <br />months trying to define each of the streetscape components (concrete, benches, planting beds, trees, <br />signs and lighting fixtures). <br /> <br />The City cm'rently has a lighting fixture standard as shown on the attachment, however, Close <br />Landscaping, City Staff, and the Developer are after a more elegant and functional lighting fixture <br />for the Town Center area. The new streetscape design indicates that the lighting fixture will be <br />placed 72 feet apart on both sides of these roadways, 100-150 apart on one side of the roadway for <br />the parkways and residential areas. <br /> <br />Brace Jacobson from Close Landscape and Architecture will be present at the meeting to make a <br />presentation about the new lighting fixture that we are recommending. <br /> <br />Attachments: <br /> <br />City's cmrent lighting fixture standards <br />Recommended new lighting fixture <br /> <br />Action Statement: <br /> <br />CCWS: 8.24.04 <br /> <br /> <br />