Laserfiche WebLink
I <br />I <br />I <br />I <br />i <br />I <br />! <br /> <br />I <br />i <br />I <br />I <br /> <br />Function <br /> <br />Timing <br /> <br />Planning <br />Considerations <br /> <br />This facility will provide metropolitan service to Champlin, <br />Anoka, Brooklyn Park, and Ramsay. It will allow the elimi- <br />nation of the Anoka Wa stewater Treatment Plant. <br /> <br />The CAB facility was approved as an amendment to <br />MVVCC 1977-81 Developr~ent Program on October 14, 1976. <br />Under the conditions of approval, if the MWCC obtains <br />maximum federal and state assistance for the entire <br />facility, it proceeds with the project; construction would <br />be completed in 1981. If full funding for the entire system <br />cannot be secured, the MW'CC will design the project in <br />two segments. The upper, or Anoka, segment could be <br />constructed in 1978-79 if state and federal financing is <br />available for it. Otherwise the feasibility of using metro- <br />politan funds will be evaluated. The upper segment would <br />convey flow to the Anoka Wastewater Treatment Plant, which <br />would remain in operation until the lower segment of the <br />CAB interceptor is constructed. The MWCC would next pursue <br />state and federal financing of the lower segment for construction <br />by 1981. This segment goes through Champlin and Brooklyn Park <br />where it would connect to existing interceptors that convey <br />sewage td the Metropolitan YVastewater Treatment Plant at <br />Pig's Eye. If state and federal financing are-not granted for <br />the lower segment, the use of full metropolitan funding would <br />be evaluated. <br /> <br />There is one point at which it is planned that <br />Ramsey would receive service through the CAB facility. <br />This point would be at the end ~of the main leg of the <br />facility at the western boundary of Anoka. Ultimately, <br />service for Ramsey in this area is planned when the <br />entire CAB facility is completed. If only the upper <br />Anoka segment (which would include this reach) is <br />constructed first, service to Ramsey is not planned <br />to be available. Otherwise, service through the CAB <br />for Ramsey will not be available until completion of <br />the entire facility, some time in 1981. <br /> <br />6 977 <br /> <br />24 <br /> <br /> <br />