My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/28/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 02/28/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:04:45 PM
Creation date
3/1/2017 1:35:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/28/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
325
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposed Improvements <br />Damaged sections of existing concrete curb and gutter will be removed and replaced, including concrete cross <br />gutters at driveways and intersections which facilitate drainage to prevent pockets of standing water which can <br />freeze in the winter resulting in unsafe conditions for drivers and pedestrians. <br />The existing bituminous pavement is proposed to be reconstructed using a process called Stabilized Full Depth <br />Reclamation (SFDR). The SFDR process would include milling the top 3 inches or so of existing bituminous <br />pavement and disposing of the millings off site. All remaining existing bituminous pavement will then be <br />reclaimed (ground up and mixed) along with most of the existing class 5 aggregate base. Approximately 1 inch of <br />reclaimed material will need to be removed from site. The remainder of the reclaim material will be spread on top <br />of the existing subgrade and a stabilizing agent will then be mixed into the reclaim material. This stabilized reclaim <br />material will be shaped and compacted into a 5 inch lift, then 4 inches of bituminous pavement will be placed on <br />top of the compacted stabilized reclaim material. This new pavement section will result in a 10-ton pavement <br />design meeting current State Aid pavement design standards. <br />The existing storm sewer system is in good condition and based on preliminary review appears to meet all <br />applicable current State Aid design standards meaning no improvements are proposed, other than necessary casting <br />adjustments. <br />The existing sanitary sewer and watermain appear to be in good condition but inspections will completed during <br />final design to ensure no repairs are needed prior to completing the proposed improvements. <br />Estimated Costs <br />The engineer's opinion of probable costs for completing the proposed improvements on Sunwood Drive as outlined <br />in the attached draft Feasibility Report is $607,000. Estimated costs include 23% indirect costs for administrative, <br />engineering, finance and legal costs. A summary of the engineer's opinion of probable costs is included in <br />Appendix Bof the Feasibility Report. <br />Funding Sources <br />The improvements are proposed to be funded using a combination of Street Reconstruction and Overlay Program <br />(SROP) bond funds, stormwater utility funds, and special assessments to benefiting properties. The majority of the <br />proposed improvements will be funded using SROP bond funds, which will be paid back over a 10 year term using <br />the general fund. This cost is estimated at $447,950 in the Feasibility Report. Stormwater utility funds will pay for <br />required storm sewer improvements estimated to cost $7,300. Special assessments are proposed to fund up to 25% <br />of eligible construction costs totaling $151,750 per the City's adopted Special Assessments Policy. A total of 9 <br />parcels receive special benefit from the improvements as identified in the attached revised preliminary assessment <br />map and roll. <br />Special Assessments <br />Per the City's adopted Special Assessments Policy special assessments can be used to pay for 25% of eligible street <br />reconstruction improvement costs, which equals $151,750 for this project. Preliminary assessments are calculated <br />using methods that result in reasonable and equitable distribution of assessments that are uniform upon the same <br />class of properties within the assessable area. The test for determining the validity of a special assessment is <br />whether the improvement for which the assessment was levied has increased the market value of the property <br />against which the assessment was levied in at least the amount of the assessment. <br />The City's adopted Special Assessments Policy identifies three optional methods for calculating assessments. The <br />9 identified benefiting properties are zoned El or E2 (industrial). Only two assessment methods are recommended <br />for assessing industrial parcels, these being the "adjusted front footage" and "area" methods. Staff initially <br />reviewed both methods as they would be applied in the current context of the policy. This review showed that the <br />adjusted front footage method results in less variance between assessments ($9K - $40K), while the area method <br />resulted in assessments that are more variable ($3K - $42K) and therefore appeared to better assign benefit based on <br />lot geometry, which includes significant differences in lot depths. <br />Staff therefore first applied the area method to calculate assessments. In doing so, Staff reviewed all assessable <br />
The URL can be used to link to this page
Your browser does not support the video tag.