Laserfiche WebLink
alternative drainage and utility easements in connection with the proposed lots in that area which have been deemed <br />satisfactory by the City Engineer. <br />The Final Plat submitted to the City on January 27th, 2017 is generally consistent with the approved Preliminary <br />Plat with changes in the Plat corresponding with requests from the preliminary plat Staff Review Letter dated <br />September 30th, 2016. <br />Generally speaking, the proposed development appears to comply with the minimum standards of the R-1 <br />Residential (MUSA) District. This is based on approval of the Comprehensive Plan Amendment, Zoning <br />Amendment, and Variances (previously approved by the Planning Commission). The Planning Commission <br />conducted a Public Hearing on October 6, 2016, and there were no written or verbal comments received. <br />Engineering comments indicate the need to connect an eight (8) inch watermain to the watermain under 166th <br />avenue. The Applicant is aware of this utility comment and that a potential arrangement for a 50/50 cost share <br />approach to complete this improvement may be available. The looping of the watermain will assist with water <br />quality rather than having a long, dead end pipe at the end of the cul-de-sac. It will also assist with minimizing the <br />number of impacted properties as a result of a break in the line. <br />The Applicant has stated a desire to commence with tree clearing and grading activities in advance of recording the <br />plat. The Applicant would like to begin work as soon as possible related to tree clearing due to the restriction on this <br />activity after April 15th due to the concern of potentially introducing Oak Wilt to the area. The Applicant and the <br />City would enter into a second Development Agreement upon the recording of the Final Plat that would cover the <br />remaining public improvements. Both agreements are attached for consideration. <br />Alternatives <br />Alternative 1: Approve the Easement Vacations for the existing trial easement and the drainage and utility <br />easement and approve the Final Plat, contingent upon compliance with the Staff Review Letter dated February 24, <br />2017. Staff believes that the proposed development is reasonable, compatible with the character of the surrounding <br />Brookfield development, and minimizes impacts to higher quality woodlands (there is an existing Conservation and <br />Trail Easement in place over portions of all lots that abutting Trott Brook) and wetlands. Staff supports Alternative <br />1. <br />Alternative 2: Deny the Easement Vacations for the existing trail easement and the drainage and utility easement <br />and deny the Final Plat. While the proposed development is similar in nature to the surrounding Brookfield <br />development and is separated from the larger lots to the south and west by a large wetland complex, if the City <br />Council does not support the Final Plat it should deny the Applicant's request. However, the Final Plat is generally <br />in compliance with the approved Preliminary Plat and thus, Staff is not supportive of this alternative. <br />Funding Source: <br />All costs associated with processing the Application are the responsibility of the Applicant. <br />The project does include consideration of a cost share to complete a watermain loop as noted above. The final <br />amount will be brought forward at a future date for final consideration. Approval of this step does not obligate the <br />City to a financial contribution, but agrees to in concept. If the final costs ultimately are outside of current <br />estimates, the City will be able to re-evaluate at that time. <br />Recommendation: <br />Staff recommends adoption of Resolution # 17-02-051: Vacation of Trail and Drainage and Utility Easements, Final <br />Plat Approval for Brookfield 8th Addition, and entering into a Tree Clearing and Grading Agreement and a <br />Development Agreement, contingent upon review and approval as to legal form by the City Attorney and <br />confirmation of street light charges by Connexus Energy. <br />Action: <br />