Laserfiche WebLink
0z� <br />ZE:41 <br />LU <br />woQ <br />EtU� <br />Lj <br />z <br />4 <br />e <br />0 <br />O <br />• <br />MNDOT 2016 SPEC <br />I MNDOT 2016 SPEC TABLE 3877-1 COMMON TOPSOIL BORROW I <br />REQUIREMENT 1 RANGE 1 TEST METHOD <br />MATERIAL PASSING THE 3/4 IN 119MM] <br />100% <br />ASTM D <br />422 <br />MATERIAL PASSING NO 4 [475MM] <br />>85% <br />— <br />CLAY <br />5% <br />—35% <br />ASTM D <br />422 <br />SILT <br />5% <br />— 70% <br />ASTM D <br />422 <br />SAND <br />10% <br />— 75% <br />ASTM D <br />422 <br />ORGANIC MATTER <br />3% <br />— 15% <br />ASTM D <br />2974 <br />PH <br />6.1-7.8 1 ASTM G 51 <br />NOTE <br />1. INSTALLATION OF 4" OF TOPSOIL MEETING MNDOT SPECIFICATION <br />3877A COMMON TOPSOIL BORROW, MAY BE REQUIRED ACROSS ALL <br />DISTURBED AREAS <br />2. A SOIL CERTIFICATION FROM A GEOTECHNICAL FIRM MUST BE <br />PROVIDED VERIFYING THE TOPSOIL MEETS SPECIFICATION ALONG WITH <br />LOAD TICKETS TO VERIFY THE SOURCE OF MATERIAL AND QUANTITY. <br />3 TOPSOIL MUST COME FROM A CITY APPROVED SOURCE <br />APPROVED. <br />1 — 2016 <br />City f'e <br />RAMSEY <br />CITY PLATE No STANDARD DETAILS. <br />ERO-6 TOPSOIL REQUIREMENTS <br />ROCK CONSTRUCTION ENTRANCE <br />d <br />TOPSOIL REQUIREMENTS <br />0 <br />TREE PROTECTION <br />• 0 <br />