Laserfiche WebLink
Public Works Committee 5. 3. <br />Meeting Date: 01/17/2017 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Consider Recommendation to City Council to Accept Draft Feasibility Report for Sunwood Drive Reconstruction, <br />Improvement Project #17-00 <br />Purpose/Background: <br />The purpose of this case is to consider providing a recommendation to the City Council for accepting the DRAFT <br />Feasibility Report for Sunwood Drive Reconstruction, City Improvement Project #17-00. <br />Timeframe: <br />Staff estimates 20 minutes will be required to present this case and respond to questions. <br />Observations/Alternatives: <br />Attached is a DRAFT copy of the Feasibility Report. Please note this is a working document still under <br />development. <br />While the majority of information in the attached draft report is complete, the preliminary assessments are currently <br />incomplete. Before publishing preliminary assessments, Staff wishes to discuss preliminary assessments for this <br />project with the Public Works Committee since the City has not yet applied the adopted Special Assessments Policy <br />to projects assessing commercial or industrial properties. Staff would therefore like to discuss the optional <br />assessment methods with the Committee before finalizing preliminary assessments within the draft Feasibility <br />Report, which is proposed to be presented to the City Council on January 24th. <br />Once the Feasibility Report is complete, meetings with individual property owners will be conducted to discuss the <br />proposed project, their preliminary assessment, and to gather feedback for future consideration by Council. <br />Alternatives: <br />Alternative #1 — Motion recommending City Council acceptance of the recommendations outlined in the draft <br />Feasibility Report for Sunwood Drive Reconstruction, City Improvement Project #17-00, with the following <br />modifications; <br />Alternative #2 — Motion denying City Council recommendation at this time. <br />Funding Source: <br />Staff proposes to fund the proposed improvements using a combination of special assessments, street <br />reconstruction bond funds, and stormwater utility funds. Staff proposes to assess 9 identified benefiting property <br />owners for 25% of the eligible project costs totaling $151,750. <br />Recommendation: <br />Staff recommends alternative #1. <br />Action: <br />Motion to recommend approval of Alternative #1. <br />