Laserfiche WebLink
4. PROPOSED IMPROVEMENTS <br />4.1 Street and Stormwater Improvements <br />The segment of Sunwood Drive between Ramsey Boulevard/CSAH 56 and Bunker Lake <br />Boulevard/CR 116 is part of the City's Municipal State Aid System (MSAS). The proposed <br />improvements must therefore be designed and constructed in accordance with current Minnesota <br />Department of Transportation (MnDOT) State Aid standards which are generally based on the <br />street's functional classification, projected traffic volume, design speed, lane designations and <br />widths, and proposed pedestrian facilities. <br />Based on the proposed design, Sunwood Drive must be reconstructed in accordance with State <br />Aid Rule 8820.9936 or 8820.9946. This will depend on the percentage of damaged curb and <br />gutter that needs to be removed and replaced, which will be determined during final design. <br />The scope of the proposed surface improvements is shown in Figure 1 in Appendix A. <br />4.1.1 Street Improvements <br />Sunwood Drive is proposed to be reconstructed with bituminous pavement matching the <br />existing width while still allowing for on -street parking along both sides of Sunwood <br />Drive. This design will meet current State Aid standards. All damaged B618 concrete <br />curb and gutter is proposed to be removed and replaced in kind. A typical section for the <br />proposed pavement reconstruction improvements is shown in Figure 2 in Appendix A. <br />The proposed reconstructed pavement design must accommodate a 10-ton design in <br />accordance with State Aid design standards. City staff is proposing a pavement section <br />design of 2 inches bituminous wear course, 2 inches bituminous base course, and 5 inches <br />of base composed of stabilized full depth reclamation. This pavement section would be <br />constructed over the existing subgrade after it is reshaped and compacted. <br />The proposed pavement design should result in a minimum pavement life of 30 years, <br />assuming that proactive, regular pavement maintenance treatments are performed during <br />the life of the pavement. While staff would typically target a 60-year design life for <br />reconstructed streets, this project is not proposing to remove and replace all curb and <br />gutter due to the good condition of the existing 20 year old curb and gutter. Therefore, it <br />may make sense to replace this pavement section at the time the existing curb and gutter <br />is replaced, which will likely be 30 or more years in the future. <br />4.1.2 Stormsewer Improvements <br />The existing storm sewer system is in good condition and meets all current State Aid <br />standards and is therefore not proposed to be improved. The only proposed storm sewer <br />improvements include repairing catch basin castings as needed. No stormwater quality <br />treatment improvements are required for this project since the street is proposed to be <br />reconstructed at its current width. <br />Feasibility Report <br />Sunwood Drive Reconstruction <br />City of Ramsey Project No. 17-00 <br />Page 6 <br />