My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/14/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 02/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:03:25 PM
Creation date
3/1/2017 1:45:39 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/14/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
904
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The existing bituminous pavement section will be reconstructed using the SFDR process outlined <br />within this report. See Pavement Evaluations and Recommendations in Appendix D for <br />additional detail. <br />4.6 Private Utilities <br />Staff has not yet met with the telephone, gas, and cable utilities regarding this project. During <br />preparation of plans and specifications, staff will meet with the private utility companies to <br />discuss the proposed improvements as noted in the project schedule within this report. The <br />alignment and footprint of the streets will be considered to minimize impacts to private utilities. <br />No impacts to power poles or street lights are anticipated with this project. <br />Should any utility companies indicate they wish to upgrade, replace and/or otherwise modify <br />their services during this project, any such upgrades, replacements and/or modifications will be <br />at the sole discretion and cost of the utilities. <br />4.7 Permits <br />Permits that are anticipated to be required as part of the proposed improvements include: <br />■ MPCA General Stormwater Permit (NPDES) Grading and Storm Water <br />A stormwater permit from the Lower Rum River Watershed Management Organization will not <br />be required with this project. <br />4.8 Right-of-Ways/Easements <br />It is anticipated that all improvements will occur within existing City right-of-ways and/or <br />easements, with the possible exception of tying into private driveways and yards. It is therefore <br />not anticipated that the City will need to acquire additional permanent right-of-way or easements <br />for this project. As such, costs for right-of-way or easement acquisitions are not included in the <br />probable project costs. <br />If rights of entries will be required from any property owners prior to construction, City staff will <br />obtain the right of entries. <br />Feasibility Report <br />Sunwood Drive Reconstruction <br />City of Ramsey Project No. 17-00 <br />Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.