My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/14/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 02/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:03:25 PM
Creation date
3/1/2017 1:45:39 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/14/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
904
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. CONCLUSIONS AND RECOMMENDATIONS <br />City of Ramsey Improvement Project 17-01 proposes to reconstruct the bituminous pavement <br />section, to remove and replace all damaged concrete curb and gutter, and to complete <br />miscellaneous appurtenant work on Alpine Drive between Armstrong Boulevard and Variolite <br />Street. This street segment measures approximately 3,600 linear feet (0.68 miles). <br />It is the recommendation of City staff that City Project No. 17-01 is feasible, necessary, and cost- <br />effective from an engineering standpoint. <br />The following staff recommendations related to the proposed project are presented for Council <br />consideration and concurrence: <br />1. Staff recommends reconstructing this street segment in 2017 as outlined in this report. <br />2. Staff recommends reconstructing the off -road bike trail along the south side of Alpine <br />Drive at a later date pending adoption of the City's Trail Maintenance Policy / Program. <br />3. Staff recommends constructing the 10-ton pavement section for Alpine Drive as proposed <br />herein to accommodate State Aid design standards. <br />4. Staff recommends requiring private property owners to protect and/or restore their own <br />irrigation systems during future street improvement projects. <br />5. Staff recommends meeting with the owner of each property in early February of 2017 to <br />inform them of the proposed improvements and to gather public input prior to requesting <br />Council approval of plans and specifications on March 28tn <br />The City Council is asked to act on the following items related to the proposed project: <br />1. Adopt Resolution #17-01-0XX accepting this Feasibility Report and ordering Plans and <br />Specifications based on the design proposed herein. <br />Feasibility Report <br />Alpine Drive Reconstruction <br />City of Ramsey Project No. 17-01 <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.