My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/14/2017
Ramsey
>
Public
>
Agendas
>
Council
>
2017
>
Agenda - Council - 02/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:03:25 PM
Creation date
3/1/2017 1:45:39 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/14/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
904
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 6. 3. <br />Meeting Date: 01/17/2017 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Staff Updates on Improvement Projects and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed improvement projects <br />within the City, and on other items of interest to the Committee. <br />City Improvement Projects <br />• Business Park 95 Regional Stormwater Pond Improvements <br />• Work is substantially complete <br />• Final payment will occur in 2017 following satisfactory completion of punch list and warranty work <br />• Andrie Street & 164th Lane Reconstruction <br />• Work is substantially complete <br />• Final payment will occur in 2017 following satisfactory completion of punch list and warranty work <br />• Riverdale Drive Extension - Traprock St. to Ramsey Blvd. <br />• Plans and specifications 99% complete <br />• In process of acquiring 5.3 acres of roadway right-of-way from Anoka County Parks (appraised value <br />$200,000) <br />• Construction will occur in 2017 <br />• Mississippi River Trail Phase 3 <br />• Grading substantially complete 2016 <br />• Aggregate base and paving will occur in spring/summer of 2017 <br />• Final completion scheduled for summer 2017 <br />• Zeolite Street Storm Sewer Extension Improvements <br />• Work is substantially complete <br />• Final payment will occur in 2017 following satisfactory completion of punch list and warranty work <br />Anoka County Improvement Projects <br />• Hanson Boulevard/CSAH 78 Grade Separation @ BNSF Railway Crossing (2017) <br />• Reconstruct County State Aid Highway 78 (CSAH 78) / Hanson Boulevard to a 4-lane divided section <br />• Construct a grade -separated overpass for Burlington Northern Sante Fe (BNSF) railway crossing <br />• Hanson Boulevard/CSAH 78 Reconstruction (2018) <br />• Expand CSAH 78 / Hanson Blvd between 139th Ave and CSAH 18 / Crosstown Blvd to 4-lane divided <br />section <br />• Foley Boulevard/CSAH 11 Grade Separation @ BNSF Railway Crossing <br />• This project is currently unscheduled and unfunded <br />MnDOT Improvement Projects <br />• Trunk Highway 10 Cable Median Barrier Installation (2018) <br />• Install cable median barrier along Highway 10 between Thurston Avenue and Highway 101 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Railway Crossing (2017) <br />• Complete preliminary design <br />Items of Interest <br />
The URL can be used to link to this page
Your browser does not support the video tag.