Laserfiche WebLink
DEPARTMENT OF <br />TRANSPORTATION <br />MnDOT-led projects on Highways 10, 47, and 65 in Anoka County: December <br />2016 update Offered by Paul Jung, Metro District • (651) 234-7716 • paul.jung@state.mn.us <br />Completed 2016 <br />Hwy 10 <br />New wear course between Hanson Blvd and University Avenue <br />Hwy 47 <br />Feasibility study for Ferry Street—BNSF Railway grade separation <br />Safety improvement at 142nd Avenue <br />Hwy 65 <br />Access Management Plan: Bunker Lake Blvd to Isanti County line <br />Reduced conflict intersection (RCI) study and educational video <br />Microsurface* southbound lanes: 217th Avenue to County 10 <br />On tap for 2017 <br />Hwy 47 <br />Preliminary design for Ferry Street—BNSF Railway grade separation <br />Beyond 2017 <br />Hwy 10 <br />Install cable median barrier between Hwy 101 and Thurston Avenue <br />(2018) <br />Hwy 47 <br />Hwy 65 <br />Mill and overlay between 27th Avenue and 40th Avenue (2018) <br />Add northbound right turn lane at St. Francis Middle School (2020/21) <br />Replace storm sewer in west ditch from 0.1 mi. south of West Moore <br />Lake Drive to 68th Avenue, replace storm sewer (2018) <br />Construct signalized RCI at Viking Boulevard; construct non -signalized <br />RCIs at 143rd, 153rd, 157th, 181st, and 187th (2018/2019) <br />Lengthen left turn lanes at several signalized intersections (2018/19) <br />Mill and overlay between County 10 and 153rd Avenue (2022) <br />* Microsurface is a 3/8-inch thick layer placed atop the existing pavement. It's a mixture of asphalt, cement, <br />and gravel. It improves safety, ride quality, and extends the pavement life. <br />(over) <br />