Laserfiche WebLink
a <br />Cri <br />0 <br />oz2 <br />w2W. <br />N <br />iYUcc <br />0 <br />oD <br />1 <br />S <br />0 <br />. Q• . <br />• z <br />• <br />MNDOT 2016 SPEC <br />MNDOT 2016 SPEC TABLE 3877-1 COMMON TOP <br />REQUIREMENT <br />MATERIAL PASSING THE 3/4 IN 119MM1 <br />MATERIAL PASSING NO. 4 [4.75MM] <br />CLAY <br />SILT <br />SAND <br />ORGANIC MATTER <br />pH <br />RANGE <br />100% <br />>85% <br />5% -35% <br />5% - 70% <br />10% - 75% <br />3% - 15% <br />6.1-7.8 <br />SOIL BORROW <br />TEST METHOD <br />ASTM D 422 <br />ASTM D 422 <br />ASTM D 422 <br />ASTM D 422 <br />ASTM D 2974 <br />ASTM G 51 <br />NOTE: <br />1. INSTALLATION OF 4" OF TOPSOIL MEETING MNDOT SPECIFICATION <br />3877A COMMON TOPSOIL BORROW, MAY BE REQUIRED ACROSS ALL <br />DISTURBED AREAS. <br />2. A SOIL CERTIFICATION FROM A GEOTECHNI CAL FIRM MUST BE <br />PROVIDED VERIFYING THE TOPSOIL MEETS SPECIFICATION ALONG WITH <br />LOAD TICKETS TO VERIFY THE SOURCE OF MATERIAL AND QUANTITY. <br />3. TOPSOIL MUST COME FROM A CITY APPROVED SOURCE. <br />APPROVED: <br />1 - 2016 <br />City f I� <br />RAMSEY <br />ITY PLATE No, <br />ERO-6 <br />STANDARD DETAILS: <br />TOPSOIL REQUIREMENTS <br />ROCK CONSTRUCTION ENTRANCE <br />TOPSOIL REQUIREMENTS <br />