Laserfiche WebLink
Transportation Plan Component <br />of City of Ramsey Comprehensive Plan <br />Introduction <br />WSB & Associates staff will prepare a Transportation Plan for the City of Ramsey consistent with <br />Metropolitan Council "Local Planning Handbook" requirements. The Transportation Plan will build upon <br />elements of the existing City of Ramsey Transportation Plan. Existing transportation plan content will be <br />utilized as much as possible, with outdated information updated to bring plan content into compliance <br />with current Met Council requirements. <br />Overall Transportation Plan Approach <br />Specific tasks assumed in development of the Transportation Plan are follows: <br />• Task 1: Project Management: WSB staff will conduct quality control and quality assurance <br />checks on all transportation plan materials that are prepared to ensure that they meet the <br />requirements of Met Council. <br />• Task 2: Agency Involvement: WSB staff will participate in one work session with the City of <br />Ramsey Public Works Committee, the MnDOT Area Manager and Anoka County transportation <br />planning staff to discuss existing and forecasted conditions, issues identification and <br />transportation plan goals and objectives. Up to six meetings are scheduled in total with City <br />staff, council, various committees, the general public and adjacent communities, as needed. <br />• Task 3: Traffic Analysis Zones (TAZs) and Travel Forecasting: WSB staff run the Met Council <br />2040 travel demand model to identify forecasted 2040 traffic for Principal Arterials and A -Minor <br />Arterials. Population, employment and household data from an approved forecasted land use <br />plan will be summarized by TAZ and broken down into 2010-2020, 2020-2030, and 2030-2040 <br />growth periods. <br />• Task 4: Roadway Component: WSB staff will prepare a Roadway component of the overall <br />Transportation Plan. Maps and supporting narrative will be prepared consistent with Met <br />Council requirements documenting the existing and proposed roadway network, associated <br />AADTs, functional classification, etc. WSB will also collect Met Council required heavy <br />commercial AADTs on City of Ramsey Principal Arterial and A -Minor Arterial roadways. Previous <br />and current transportation studies in the Ramsey and adjacent communities will be documented <br />and integrated into the roadway component, as appropriate. Access Management will be also <br />be discussed and best practices referenced. <br />• Task 5: Transit Component: WSB staff will prepare a Transit component of the overall <br />Transportation Plan. The Transit component will include discussion of existing transit service <br />and associated infrastructure. Existing and forecasted gaps in transit service will also be <br />discussed. <br />• Task 6: Bicycling and Walking Component: WSB staff will prepare a Bicycling and Walking <br />component of the overall Transportation Plan. The Bicycling and Walking component will <br />