My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 02/14/2017
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2017
>
Agenda - Council Work Session - 02/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:03:36 PM
Creation date
3/1/2017 1:48:36 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
02/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. EXECUTIVE SUMMARY <br />City Improvement Project 17-00 proposes to reconstruct Sunwood Drive between Ramsey <br />Boulevard/CSAH 56 and Bunker Lake Boulevard /CSAH 116 which totals approximately 3,050 <br />linear feet (0.58 miles) in length. A map showing the location and scope of the proposed <br />improvements is included as Figure 1 in Appendix A. <br />This segment of Sunwood Drive was constructed in 1996 with 3.5 inches bituminous pavement, <br />5 inches class 5 aggregate base, B618 concrete curb and gutter, and concrete storm sewer. The <br />street was constructed to a width of 40 feet from face -of -curb to face -of -curb, and is centered <br />within an 80 foot wide right-of-way. The storm sewer system consists of numerous catch basins <br />which drain runoff from the street to adjacent low-lying areas using concrete storm sewer pipes. <br />City staff evaluates and rates the condition of pavement sections on all city streets on an annual <br />basis using the Pavement and Surface Evaluation Rating (PASER) system. In the fall of 2016, <br />this segment of Sunwood Drive was rated with PASER ratings of 3 and 4, depending on location, <br />which indicates this street is past the point of applying mill and overlay improvements. The <br />current condition of this street requires City staff to patch the street at least once per year, <br />particularly before winter so the street can be plowed without further damaging the pavement in <br />the process. Pictures of this street segment are located in Appendix A. <br />Proposed improvements include removing and replacing all damaged concrete curb and gutter <br />sections, and reconstructing the existing bituminous pavement section using a process called <br />Stabilized Full Depth Reclamation, or SFDR. For this project, the SFDR process would involve <br />milling the top 3 inches of existing bituminous pavement and disposing of the millings off site. <br />The remaining 1-plus inch of existing bituminous pavement would then be ground up and mixed <br />with 2 inches of the existing aggregate base. This reclaim material would then be placed on top <br />of the reshaped and compacted subgrade, after which an asphalt emulsion stabilizer would be <br />injected and mixed into the reclaim material. This stabilized reclaim material would be placed <br />and compacted on top of the subgrade, then 4 inches of new bituminous pavement would be <br />placed on top. This would result in a 10-ton pavement design meeting current State Aid <br />pavement design standards. <br />The existing storm sewer system is in good condition and based on preliminary review appears <br />to meet all applicable current State Aid design standards so no improvements are proposed. <br />An off-street 10 foot bituminous bike trail exists along the north side of Sunwood Drive and is in <br />relatively good condition so no improvements are proposed with this project. <br />The engineer's opinion of probable costs for completing the proposed improvements on <br />Sunwood Drive as outlined in this report is $607,000. Estimated costs include 23% indirect <br />costs for administrative, engineering, finance and legal costs. A summary of the engineer's <br />opinion of probable costs is included in Appendix B. <br />A total of 9 parcels have been identified as receiving special benefit from the improvements. <br />These parcels are identified in the preliminary Assessment Map and Roll which are attached in <br />Appendix C. <br />Feasibility Report <br />Sunwood Drive Reconstruction <br />City of Ramsey Project No. 17-00 <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.