My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 02/14/2017
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2017
>
Agenda - Council Work Session - 02/14/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:03:36 PM
Creation date
3/1/2017 1:48:36 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
02/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
186
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. CONCLUSIONS AND RECOMMENDATIONS <br />City of Ramsey Improvement Project 17-00 proposes to reconstruct the bituminous pavement <br />section, to remove and replace damaged concrete curb and gutter, and to complete miscellaneous <br />appurtenant work on Sunwood Drive between Ramsey Boulevard/CSAH 56 and Bunker Lake <br />Boulevard /CSAH 116. This street segment measures approximately 3,050 linear feet (0.58 <br />miles). <br />It is the recommendation of City staff that City Project No. 17-00 is feasible, necessary, and cost- <br />effective from an engineering standpoint, and that this project would best be constructed as a <br />stand-alone project as proposed herein. <br />The following Staff recommendations related to the proposed project are presented for Council <br />consideration and concurrence: <br />1. Staff recommends reconstructing the segment of Sunwood Drive between Ramsey <br />Boulevard/CSAH 56 and Bunker Lake Boulevard /CSAH 116 as proposed herein in 2017 <br />thereby meeting current State Aid design standards and allowing all project costs to be <br />eligible for the use of special assessments per the City's Special Assessments Policy. <br />2. Staff recommends ordering an assessment appraisal consultation report to ensure that the <br />preliminary special assessments proposed herein will not exceed the benefit received as a <br />result of the improvements in accordance with the City's Special Assessments Policy. <br />3. Staff recommends reconstructing the off -road bike trail along the north side of Sunwood <br />Drive at a later date pending adoption of the City's Trail Maintenance Policy/Program. <br />4. Staff recommends excluding private irrigation system work from this project, and from <br />all future City Improvement Projects, and instead recommends notifying property owners <br />of pending construction as far in advance as possible and instructing them to relocate the <br />irrigation system(s) away from the construction area during construction, then allow <br />replacement in or near the original location after construction is complete. <br />5. Staff recommends meeting with all owners of assessable properties, and all area business <br />owners, to inform them of the proposed improvements, the proposed use of special <br />assessments, and to gather their input prior to conducting the Public Hearing and <br />requesting Council authorization to prepare plans and specifications on February 14th. <br />The City Council is asked to act on the following items related to the proposed project: <br />1. Accept the preliminary industrial special assessment rates proposed herein. <br />2. Adopt Resolution #17-01-028 accepting this Feasibility Report and ordering a Public <br />Hearing for February 14, 2017. <br />Feasibility Report <br />Sunwood Drive Reconstruction <br />City of Ramsey Project No. 17-00 <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.